Special Summer Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

USGBC LEED-AP-BD+C Actual Questions

Page: 12 / 25
Total 337 questions

LEED AP Building Design + Construction (LEED AP BD+C) Questions and Answers

Question 45

A project team member has prepared a map and accompanying table as documentation for the Location and Transportation Credit. Surrounding Density and Diverse Uses. Option 2. Diverse Uses. The map includes the location of each diverse use. the location of the project and the main entrance of the building. The table includes the distance to each use. the name of each use and the category of each use The team lead reviews the documentation and notes an important missing item. Which of the following is the most important item to add to the documentation?

Options:

A.

A description of each use

B.

The location of parking lots near each use

C.

Walking routes from the project to each use

D.

A calculation of the expected number of project occupants who will visit each use

Question 46

For Location and Transportation Credit, Access to Quality Transit, a project team preparing timetables and service-level documentation must ensure the materials include

Options:

A.

verification that a weighted daily average has been used for each qualifying route

B.

confirmation that functional entries of the project are within 3/4 mi. (1.20 km) of the stop

C.

verification that a weighted building average has been used for each qualifying functional entry

D.

confirmation that each qualifying route features paired route service (service in opposite directions)

Question 47

What nonroof measure contributes to the achievement of Sustainable Sites Credit, Heat Island Reduction, Option 1. Nonroof and Roof?

Options:

A.

Use a high reflectance roof finish

B.

Install artificial turf

C.

Locate a minimum of 75% of parking spaces under cover

D.

Provide shade with structures covered by energy generation systems

Question 48

Which is a benefit of earning Regional Priority credits?

Options:

A.

The LEED project can achieve more sustainable outcomes by recognizing the issues that are a priority in the project's location

B.

The context of the project's location is not addressed, allowing the project team to focus on the building's priority issues

C.

The project's operations are considered separately from design and construction, allowing the project team to focus on regional issues

D.

The LEED project is able to skip a review phase by considering the issues that are a priority in the project's location

Page: 12 / 25
Total 337 questions