LEED AP Building Design + Construction (LEED AP BD+C) Questions and Answers

Question 93

What are the three phases within the Integrative Process Credit, Integrative Process?

Options:

A.

Pre-design, Discovery, Design and Construction

B.

Discovery, Design and Construction, Operations and Feedback

C.

Schematic Design, Design and Construction, Operations and Feedback

D.

Design Charrette, Schematic Design, Operations and Feedback

Question 94

What issue must be present on the project site to achieve Location and Transportation Credit, High-Priority Site, Option 3. Brownfield Remediation?

Options:

A.

Mercury containing lamps

B.

Contaminated soil or groundwater

C.

Asphalt construction waste

D.

Asbestos tile and glue

Question 95

Who must be a member of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

Options:

A.

The general contractor

B.

A LEED AP

C.

The project's mechanical engineer

D.

The owner or an owner's representative

Question 96

What reference standard is used to determine compliance with the Energy and Atmosphere Prerequisite, Minimum Energy Performance when the whole building energy modeling option is used?

Options:

A.

ASHRAE 55-2010

B.

ASHRAE 90.1-2007

C.

ASHRAE 90.1-2010

D.

ASHRAE 62.1-2010