Black Friday Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Free Access USGBC LEED-AP-BD+C New Release

Page: 18 / 20
Total 269 questions

LEED AP Building Design + Construction (LEED AP BD+C) Questions and Answers

Question 69

When the LEED AP is applying the Integrative Process to a Building Design and Construction project, when should the Owner’s Project Requirements (OPR) be created and updated?

Options:

A.

Prior to beginning design and are generally not updated

B.

Once the project design is completed and edited throughout the project

C.

During predesign and are edited throughout the project

D.

After the design is completed and are generally not updated

Question 70

Which of the following is a leadership extraction practice that rewards projects for choosing materials with closed-loop recycling and take-back programs in LEED?

Options:

A.

Material reuse

B.

Bio-based elements

C.

Extended producer responsibility

D.

Forest Stewardship Council (FSC) wood products

Question 71

Which item is included in the reuse calculation for Materials and Resources Credit, Building Life-Cycle Impact Reduction?

Options:

A.

Floor decking

B.

Asbestos insulation

C.

Exterior glazing

D.

Plumbing fixtures

Question 72

Who must be a member of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

Options:

A.

The general contractor

B.

A LEED AP

C.

The project's mechanical engineer

D.

The owner or an owner's representative

Page: 18 / 20
Total 269 questions