LEED AP Building Design + Construction (LEED AP BD+C) Questions and Answers

Question 25

The project landscape architect suggests reducing the area planned for surface parking and replacing it with additional vegetated space. What benefit would this strategy provide to the owner?

Options:

A.

Increases the rainwater infiltration capacity

B.

Decreases the amount of bicycle parking that must be provided

C.

Increases the overall SR (solar reflectance) of the hardscape area

D.

Decreases the required amount of on-street parking that must be provided

Question 26

For Location and Transportation Credit, Access to Quality Transit, a project team preparing timetables and service-level documentation must ensure the materials include

Options:

A.

verification that a weighted daily average has been used for each qualifying route

B.

confirmation that functional entries of the project are within 3/4 mi. (1.20 km) of the stop

C.

verification that a weighted building average has been used for each qualifying functional entry

D.

confirmation that each qualifying route features paired route service (service in opposite directions)

Question 27

A LEED AP submitted a Preliminary Design and Construction review and has received a review comment and technical advice on Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning. Which of the following actions should the LEED AP do if the project continues to pursue LEED certification?

Options:

A.

Revise the documentation and resubmit the form

B.

Abandon meeting this prerequisite

C.

Submit an appeal to Green Business Certification Inc.

D.

Ask the General Contractor to be more aggressive with recycling goals

Question 28

Which of the following strategies would be considered an acceptable minor improvement within the wetland buffer for Location and Transportation Credit, Sensitive Land Protection?

Options:

A.

Build a two-story fitness facility

B.

Change the grade to install a security fence

C.

Provide a vehicular access drive that is less than 16 ft. (5 m) in width

D.

Remove trees that are less than 6 inches (15.24 cm) diameter at breast height