Question 33

An existing vacant office building will be completely renovated and new mechanical, electrical and plumbing systems will be installed. 20% of the building's gross floor area will be complete at the time of certification. There will be a data center and some retail stores on the ground floor of the building at a future date. Which rating system is applicable for the building?

Options:

A.

LEED BD+C: Retail

B.

LEED BD+C: Data Centers

C.

LEED BD+C: Core & Shell Development

D.

LEED BD+C: New Construction & Major Renovation

Question 34

Which of the following will result in a higher demand for potable water use in irrigation?

Options:

A.

Sparsely planted area

B.

Drip irrigation system

C.

High evapotranspiration rate

D.

Rainwater harvesting system

Question 35

Which would contribute to compliance with Sustainable Sites Credit, Open Space?

Options:

A.

A mall with an indoor atrium, featuring a reflective roof

B.

A parking lot that serves as the location for a monthly flea market

C.

An intensive vegetated roof, provided the building has at least a 1.0 Floor to Area Ratio (FAR)

D.

A forested area containing nature trails, that also achieves Sustainable Sites Credit, Site Development – Protect or Restore Habitat

Question 36

When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following information is required to be present in the Owner's Project Requirements (OPR)?

Options:

A.

All applicable codes and standards

B.

Interior finishes related to the project

C.

All project team members and applicable roles

D.

Energy efficiency goals and training requirements

Page: 9 / 20