Black Friday Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Legit LEED-AP-BD+C Exam Download

Page: 10 / 20
Total 269 questions

LEED AP Building Design + Construction (LEED AP BD+C) Questions and Answers

Question 37

A project in a cold climate does not want a highly reflective roof because they want the heat absorption. How can this

project comply with Sustainable Sites Credit, Heat Island Reduction?

Options:

A.

The credit is not feasible for this project

B.

The credit may be achieved by using nonroof measures only

C.

The credit is applicable for projects that document this special condition

D.

The credit can only be achieved by using an alternative compliance path

Question 38

Which of the following is an example of a nonroof measure for Sustainable Sites Credit, Heat Island Reduction?

Options:

A.

A playground with artificial turf

B.

A vegetated shading structure

C.

A shade structure with a three-year aged Solar Reflectance Index (SRI) value of 0.2

D.

A paving material with a three-year aged SRI value of 0.2

Question 39

For a new project with a $10 million construction cost, the weight of the total recycled content is 0.9 tons (816.5 kilograms) each for post-consumer and pre-consumer recycled content. The value of the total recycled content is one million each for post-consumer and pre-consumer recycled content. What is the percentage of recycled content that contributes toward Materials and Resources Credit: Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2, Leadership Extraction Practices?

Options:

A.

33%

B.

20%

C.

40%

D.

18%

Question 40

Massing and orientation in Integrative Process Credit. Integrative Process evaluates how rotating the building 90 degrees affects

Options:

A.

energy loads

B.

lighting levels

C.

ventilation methods

D.

thermal comfort ranges

Page: 10 / 20
Total 269 questions