Certified Facility Manager Questions and Answers

Question 1

A facility manager has implemented a room scheduling system to improve workplace utilization and bundle services into a single transaction. Which two technologies BEST complement room scheduling technologies?

Options:

A.

Locally installed room scheduling devices and radio frequency identification (RFID) chips

B.

Power over Ethernet (PoE) switches and electronic mail

C.

Electronic booking system and locally installed room scheduling devices

Buy Now
Question 2

Some new carpets can emit volatile organic compounds (VOCs) that can adversely affect occupants.

How can the facility manager avoid this problem when purchasing new carpeting?

Options:

A.

Research emissions data from carpet manufacturers.

B.

Increase the air flow in the space.

C.

Allow at least one month for off-gassing before occupancy.

D.

Treat carpeting during install.

Question 3

What is a reason to invest in real estate?

Options:

A.

Sales tax advantage.

B.

Capital appreciation.

C.

Irregular return.

D.

Capital depreciation.

Question 4

What is the benefit of documenting lessons learned for projects?

Options:

A.

Provides inputs to the project issue log

B.

Summarizes the effect of decisions made on a project and serves as a guide for what to repeat and what to avoid in future projects

C.

Provides key inputs to create the project charter, develop the project management plan, and finalize the stakeholder register

Question 5

A facility manager is investigating the feasibility of purchasing a new gas-fired turbine. The turbine is expected to be in service for 12 years. The vice president of operations asked the facility manager to calculate how much the turbine will diminish in value each year over its service life. What is being calculated?

Options:

A.

Payback period

B.

Depreciation

C.

Diminishing return

D.

Life cycle cost

Question 6

A new hire has been provided with new uniforms and a $150 stipend to purchase new work boots. Within the first month of employment, the employee informs the manager that another job has been accepted and provides a two-week notice. What actions should the manager take regarding the material issuances?

Options:

A.

Ask in a thoughtful and respectful tone for the employee to reimburse the organization for the uniforms and work boots.

B.

Absorb the loss of the material in the operating budget under uniform depreciation.

C.

Refer to the employee handbook and follow organizational policy regarding uniform and work boot issuances.

Question 7

What functionality enables a Building Automation System (BAS) to support energy management during peak demand periods?

Options:

A.

Thermal coupling

B.

Capacity management

C.

Load shedding

D.

Cycle management

Question 8

Which task should occur during the first phase of sustainable plan development?

Options:

A.

Assign members to assist with developing a business case

B.

Review preliminary business cases

C.

Define what criteria will be used to consider and evaluate ideas

D.

Develop cash flow

Question 9

Employees in a research laboratory have been reporting an increased amount of static electricity charges that are negatively impacting their ability to perform certain experiments. What indoor air quality system should be assessed?

Options:

A.

Heating

B.

Air circulation

C.

Humidification

D.

Cooling

Question 10

What should be the INITIAL driver when developing a facility management communications plan?

Options:

A.

Vision statement

B.

Email communication

C.

Strategic plan

Question 11

What should the FM department do in the ongoing monitoring of a newly outsourced Property Management contract?

Options:

A.

Explain the evaluation methodology based on the identified Key Performance Indicators.

B.

Include opportunity for the Contractor to respond to non-compliances.

C.

Ensure that all codes and regulations are met.

D.

Create an incentive program for innovative work.

Question 12

What activity would increase a facility's carbon footprint?

Options:

A.

Replacing filters in the air handlers

B.

Extending the occupancy hours

C.

Replacing the existing system with high-efficiency equipment

Question 13

A facility manager has developed a new health and safety program. What should be the next step?

Options:

A.

Post the program on the internal website for employees to read and take action.

B.

Put a notice on the bulletin board explaining the health and safety program.

C.

Send out an email announcing the new health and safety program.

D.

Develop a formal communication plan outlining the various tools used to communicate to the staff.

Question 14

What is a facilities register?

Options:

A.

A list of accounts representing the contracted services for a facility.

B.

A comprehensive list of the organization’s facility assets, including buildings, grounds, and infrastructure.

C.

An integrated work management system utilized in a facility to track preventative and on-demand work orders.

D.

A master list of emergency contacts for use in business continuity/emergency purposes.

Question 15

When your company is considering consolidating its real estate portfolio, what are the most critical factors to consider?

Options:

A.

Current space utilization, overall occupancy cost per square foot, geographic proximity/overlap.

B.

Lease vs own status, neighborhood amenities, political environment.

C.

Make-up of the workforce, outdated interiors, tax incentives.

Question 16

What, in addition to vision, incentives, action plan, and resources, is required for the change management process to be effective?

Options:

A.

Experience

B.

Support

C.

Directives

D.

Skills

Question 17

What is a good reason to get the facilities engineers involved early in the planning of a new building design or major renovation?

Options:

A.

To create operational and energy usage benchmarks at the beginning of the project

B.

To ensure that the as-built drawings are accurate

C.

To ensure that the design optimizes the operations and maintenance of the proposed building systems

D.

To ensure that all punch list items have been adequately addressed

Question 18

You work for a company that provides facility management services for a bank. The bank wants your company to demonstrate its commitment to continuous improvement in service delivery. How can you demonstrate to the bank your commitment to continuous improvement?

Options:

A.

Find out what other banks do in terms of continuous improvement.

B.

Write to the bank stating your commitment to continuous improvement.

C.

Include indicators relating to continuous improvement in the service level agreement.

D.

Ask the bank to submit a list of continuous improvement requirements.

Question 19

What is the BEST strategy to reduce waste in an organization?

Options:

A.

Reuse.

B.

Prevention.

C.

Recycling.

D.

Composting.

Question 20

Both the facility and information technology managers are asked to assign staff to work together on a major project. Halfway through the project, the managers observe that the team is in a win-lose power struggle because of divergent views among team members. How should the facility and information technology managers initially intervene?

Options:

A.

Reestablish meeting guidelines

B.

Reassign project managers

C.

Assign new team members who have similar personalities

D.

Assign additional members from each department to foster more problem-solving

Question 21

When in the bidding process can vendors receive clarification to improve the quality of their proposal?

Options:

A.

Request for Proposal.

B.

Bidder Presentation.

C.

Pre-bid meeting.

D.

Selection Criteria.

Question 22

What is one way, as a Facility Manager, you can contribute to your company's ESG goals?

Options:

A.

Support continued education for your staff

B.

Implement quality control measurements in your operation

C.

Source materials and parts from companies that have fair pay and living wage standards

D.

Reduce spend by eliminating spare part inventories

Question 23

Which technology would be BEST to notify facility occupants during an emergency?

Options:

A.

Company's social media profile.

B.

Emergency notification system.

C.

E-mail system.

D.

Incident management system.

Question 24

Which statement about fiber optic cable is correct?

Options:

A.

Very low resistance to noise and interference

B.

It has fewer environmental effects than copper wiring or cable

C.

Ability to carry signals for short distances before requiring repeaters than copper cable

Question 25

You have been informed about a heavy water leakage, but you are away from town. How would you guide the on-site staff?

Options:

A.

Advise staff to scan the building to isolate the water leak. They should also evacuate people from the area of the leak.

B.

Direct staff using the facility master plan, as-built layout drawings, and the BMS to identify the source of the leak.

C.

Direct the staff to immediately call in a contractor.

Question 26

What series of ISO standards defines the requirements of an environmental management system that can be used by the organization to measure and document the organization's environmental impact?

Options:

A.

ISO 14001

B.

ISO 14021

C.

ISO 14025

D.

ISO 14024

Question 27

A new department manager is not clear on the services provided by the facility management department and is often negative about facility management while at management meetings. How should a facility manager address the customer's expectations?

Options:

A.

Request that the manager refrain from complaints at this meeting as it is not the appropriate venue.

B.

Request that the other managers have a discussion with him about office protocol.

C.

Request that he read his service level agreement.

D.

Review the customer service level agreement to determine a mutually agreed performance standard.

Question 28

The facility manager is managing an office renovation. The entire renovated area is to be re-carpeted with synthetic roll carpet over the weekend. What should be done prior to installation?

Options:

A.

Wrap the carpet in plastic to minimize the release of vapors before the weekend

B.

Send an email to all staff to open all the windows

C.

Ask the dealer to off-gas the carpet off-site

Question 29

You receive numerous complaints from occupants in a facility about technology "dead zones" within certain areas of the campus. The complaints indicate that wireless connections fail and mobile phone signals drop when in a specific area of the facility. What additional information do you require to successfully address this issue?

Options:

A.

Wireless repeater locations

B.

Wireless frequencies affected

C.

Time of day outages occur

D.

Mobile phone service provider

Question 30

What is an industry standard quality program?

Options:

A.

Computerized Maintenance Management Reports

B.

Facility Management Benchmarks

C.

Six Sigma

D.

Certified Maintenance and Reliability Reports

Question 31

What may be impacted if requirements aren't captured correctly at the beginning of an Integrated Workplace Management System (IWMS) implementation?

Options:

A.

Cost and schedule

B.

Temperature control and cost

C.

Special relations and utilizing color

Question 32

During a large real estate project, what are the expenses of planning, design, construction, operation, maintenance, and disposition of a structure over time known as?

Options:

A.

Life-cycle costing.

B.

Investment analysis.

C.

Time value of money.

D.

Project classification.

Question 33

Your company has been successful in obtaining business with a new client that has stores in malls and on campuses. You will be responsible for contracting and managing third-party services formerly managed by your new client's onsite managers at multiple retail locations. Your client has asked that, to the best of your ability, you retain current contractors and, more importantly, their staff members. The agreement between your company and the client requires that you reduce the client's expense for the contracted services by 6%. Who are the stakeholders in your newly obtained client?

Options:

A.

Other companies in the malls and campuses where your client has stores

B.

Client customers, internal stakeholders, indirect stakeholders, and service providers and partners

C.

Client staff and visitors at each store

D.

Managers within your company who manage comparable client services

Question 34

What are the four phases of a strategy life-cycle model?

Options:

A.

Understand, analyze, plan, and act

B.

Initiate, plan, execute, and close

C.

Introduction, growth, maturity, and decline

D.

Plan, do, check, and act

Question 35

When would an organization choose a lease with a purchase option?

Options:

A.

When tax rebates cannot be applied.

B.

When it lacks the initial capital for the purchase.

C.

When it has long-term plans to develop the real estate.

D.

When it needs to partner with a developer.

Question 36

What measures could you have taken to ensure your staff member focused on measurable priorities that you had established?

Options:

A.

You should have made it clear when hiring your Project Coordinator that it was his responsibility to ensure his projects were completed in a quality manner.

B.

The Project Coordinator should have set up regular appointments with you to demonstrate how he was completing his tasks according to the performance measures that he established.

C.

You should have hired a very experienced Project Coordinator to ensure that your priorities were met.

D.

You should have met with your Project Coordinator regularly to prioritize work, review assigned projects, and report on performance.

Question 37

What advantages can you gain by capturing and applying lessons learned in a multi-phased project?

Options:

A.

Documenting lessons learned provides a way to pass on and usefully apply knowledge gained in one project to other projects. This saves time and money by preventing mistakes, streamlining work processes, and freeing staff to deal with unique aspects of later phases.

B.

Purchases made in earlier phases can be reused in later phases, saving money through efficient management of resources and negotiation of discounts with vendors as project managers learn to work with vendors.

C.

Since every phase is different, the only advantage of moving solutions forward is to know what has already been tried as learned from a previous situation.

D.

People learn what works and how to get along with their peers and leaders. As a result, teams can be organized so conflicts can be avoided since interpersonal relationships have already been tested.

Question 38

Recently, an organization has flattened its structure versus that of a typical pyramid structure. As part of the restructure, the existing office building will be renovated. What type of design elements should a facility manager consider in the renovation?

Options:

A.

Offices for management, teaming areas, shorter workstation panels, and large conference rooms

B.

Team areas, bigger workstations for files, offices for senior management, and fewer meeting rooms

C.

Space for employee interaction, team areas, smaller workstations, and shorter panels

Question 39

Your senior leadership decided to implement an energy dashboard to track utility consumption. They want a baseline before commissioning has started to evaluate the results. How should this commissioning information be used on the dashboard?

Options:

A.

To show the month's utility usage after commissioning and guide decisions on installing additional equipment.

B.

To show how much energy comes from the grid and how much from renewable sources.

C.

To show changes in energy usage as commissioning projects are completed and determine whether the project achieved the desired outcomes.

D.

To show monthly kilowatts used by individual pieces of equipment.

Question 40

What is the process of limiting a company's exposure to liability?

Options:

A.

Risk management.

B.

Risk avoidance.

C.

Liability management.

D.

Limited liability analysis.

Question 41

What tool can be used to help determine whether a specific change strategy will produce promised results?

Options:

A.

A GAP analysis

B.

A feasibility study

C.

A customer survey

Question 42

What important factor forms the basis for Risk Management strategies?

Options:

A.

Knowledge of the organization's departmental goals, risks, and objectives.

B.

Knowledge of the leadership strategies that capture the organization's objectives.

C.

Knowledge of how the organization will respond to the possible impacts of risks.

Question 43

What is one of the MOST common reasons implementing a Computerized Maintenance Management System (CMMS) fails?

Options:

A.

Users are resistant to change.

B.

The board members are not interested in the system.

C.

The CMMS is home-grown.

D.

The building systems are not compatible with the CMMS.

Question 44

A company has decided to establish a long-range strategic facility technology plan. What is the first step in determining the future technology needs of the company?

Options:

A.

Determine the level of employee technological skill requirements for the future.

B.

Review corporate plans for building renovations and lease negotiations.

C.

Research advances in technology.

D.

Conduct an assessment of existing technology.

Question 45

What describes a facility condition assessment?

Options:

A.

A report detailing the sustainability goals of an organization

B.

A five to ten-year facility plan incorporating owned and leased space

C.

An inspection and analysis of energy flows in a building with the objective of understanding energy efficiency

D.

A report of the current state of a building and component systems

Question 46

A recently installed speed bump that slows traffic for pedestrian safety in the facility parking lot is diverting water runoff away from the drain and toward an adjacent property. What factors should the facility manager consider when fixing the drainage problem?

Options:

A.

The facility manager’s responsibility ends at the property line, and no decision is necessary.

B.

Use water runoff as an irrigation source and control parking lot traffic.

C.

Pedestrian safety supersedes stormwater runoff issues, and no decision is necessary.

D.

Ensure pedestrian safety and resolve stormwater runoff issues.

Question 47

What is the MOST effective tool in managing change?

Options:

A.

Managing resistance.

B.

Anticipating user denial.

C.

Using surveys.

D.

Communication.

Question 48

Your company is evaluating a commercial office building for a new acquisition. What documents are the most important to review during the due diligence process?

Options:

A.

Current building as-built drawings

B.

Local building codes

C.

Current tenants' leases

Question 49

What detailed review process results in a score outlining the status, age, and life cycle condition of a building and its components?

Options:

A.

Post-occupancy evaluation.

B.

Facility condition assessment.

C.

Life cycle cost analysis.

Question 50

What is an effective way to engage your staff in generating ideas that support the organization’s goal?

Options:

A.

Consider only those ideas of select staff.

B.

Roll out to the organization those processes which you believe are effective.

C.

Obtain feedback from staff and implement those ideas with positive feedback.

D.

Develop an open-door policy and dialogue with staff on how the team may help the organization achieve its goals.

Question 51

What factors are included in the SMART approach to developing key performance indicators?

Options:

A.

Systematic, measurable, achievable, reliable, time-bound.

B.

Specific, measurable, achievable, rational, time-bound.

C.

Specific, measurable, achievable, relevant, time-bound.

D.

Systematic, measurable, achievable, related, time-bound.

Question 52

What is the calculation for the building efficiency ratio?

Options:

A.

The common area divided by the usable area, multiplied by 100

B.

The rentable area divided by the gross area, multiplied by 100

C.

The gross area divided by the usable area, multiplied by 100

D.

The usable area divided by the rentable area, multiplied by 100

Question 53

What is the BEST course of action for a facility manager to take when an engineer continues to lag behind other engineers in productivity?

Options:

A.

Use the engineer as an example of how not to perform to other engineers.

B.

Report the engineer to Human Resources.

C.

Develop a performance improvement plan with the engineer.

D.

Give the engineer a chance to correct his deficiencies on his own.

Question 54

What is the greatest benefit to implementing an Integrated Work Management System (IWMS)?

Options:

A.

It will make the board members happy.

B.

The building floor plans will all be in one place.

C.

It will improve customer service.

D.

The building systems will no longer need to be monitored.

Question 55

What approach should be taken to accommodate sustainability and customer concerns about installing flow restrictors?

Options:

A.

Take no action. The WPM is guided by company sustainability initiatives and this program needs to be implemented.

B.

Offer to place out the flow restrictors in a few designated restrooms to provide customer feedback on their performance. Agree to review and meet later with the WPM.

C.

Install the flow restrictors and remove them without informing the WPM.

D.

Refuse to install the flow restrictors.

Question 56

What purpose does project evaluation serve?

Options:

A.

To assess whether the project's objectives are being met

B.

To resolve claims and disputes in a timely manner

C.

To provide control of a project

D.

To track and monitor project progress

Question 57

What does a Cost Plus to a Guaranteed Maximum Price (GMP) contract signify?

Options:

A.

The Contractor is selected based on final drawings and his own costs and the individual subcontractors' costs. No cost increases are allowed beyond the GMP.

B.

The Contractor is selected based on GMP price of the final drawings and can charge the project based on all invoices produced plus its Fee & General Conditions costs.

C.

The Contractor is selected early in the project based on its Fee and its General Conditions costs and provides a GMP once drawings are more developed.

Question 58

What is used to control lighting, HVAC, and other systems?

Options:

A.

Building Automation Systems (BAS)

B.

Geographical Information Systems (GIS)

C.

Computer-Aided Maintenance Management Systems (CMMS)

D.

Building Information Modelling (BIM)

Question 59

What are the three steps in conducting a risk assessment?

Options:

A.

Identification, analysis, and evaluation.

B.

Analysis, consultation, and review.

C.

Consultation, identification, and treatment.

D.

Likelihood, consequence, and rating.

Question 60

When considering location alternatives, what should the facility management professional know?

Options:

A.

Executive preferences and drivers.

B.

Market and available workforce.

C.

New construction activity.

D.

Retail and competitor locations.

Question 61

You are part of a team developing a plan for the layout of a 500-acre planned community. The plan shows roads, utilities, and different types of buildings within the development community. This plan will be provided to government entities for permitting. What is this set of specifications called?

Options:

A.

A planned community sustainability plan.

B.

A real estate development tactical plan.

C.

A real estate master plan.

D.

An architectural context diagram (ACD).

Question 62

Following a workplace accident, what is the MOST appropriate risk management action for a facility manager?

Options:

A.

Review existing risk assessments and update within six months.

B.

Retrain staff in existing risk assessments and safe work practices.

C.

Identify who knew of the risk of an accident and discipline them.

Question 63

How can the building information model (BIM) be used for emergency preparedness?

Options:

A.

It provides first responders with the names of all building occupants.

B.

It is not useful for emergency preparedness.

C.

It creates a virtual environment of the building for emergency personnel.

D.

It can help predict how an emergency will unfold.

Question 64

A facility manager provides integrated facility services for a client with multiple mixed-use sites. This includes all services except the client's core business. The annual business review of the services provided identifies dissatisfaction with comfort levels at two of the sites, including the data center building. To improve the service effectively, the client will need to make an extensive capital equipment investment not previously contemplated. What is the BEST way to communicate the HVAC issue to your client?

Options:

A.

Hold a series of meetings with the client—first to discuss the issues, second to identify solutions, and finally to quantify the impact on operations.

B.

Prepare a report outlining the issues and solutions and send it to the client, requesting a meeting after the report has been reviewed.

C.

Prepare a report and meet with the client to present the issues, recommended solutions, and explain the impact on business operations.

D.

Schedule a meeting with the client and the department heads impacted by the HVAC issues to talk about the problems.

Question 65

You have taken a position in a new country and do not speak the native language. However, your first task will be a facility renovation project. You need to become familiar with the standards, regulations, and laws that are applicable to a facility renovation project. What information source would be most accurate?

Options:

A.

The laws for the country’s national government

B.

The local authority having jurisdiction

C.

The owner's corporate legal department

D.

The organization that wrote each law, standard, and regulation

Question 66

You work for an organization that puts a strong emphasis on corporate values and being the employer of choice; truly valuing their people. The organization has put a lot of time and effort into ensuring that policies and procedures are in place to create an environment where employees are valued. This includes the company's performance appraisal system. How do you ensure the employees meet the expectations of the organization as well as your expectations?

Options:

A.

The organization will provide the format for performance reviews, including how often they occur. Set performance measures with employees and review with them according to the organization policy.

B.

Conduct an annual performance review as specified by HR. Have the employees develop a list of goals for themselves, taking into account the organization's objectives for next year.

C.

Develop performance measures and have the employees confirm their goals in writing and send monthly reports on progress towards their goals, including any issues they are facing.

D.

Set performance measures that are specific, measurable, and realistic. Tie these performance measures to department and organizational goals. Conduct monthly coaching sessions to review progress with the employees and provide coaching as needed to keep them on track.

Question 67

Which type of equipment maintenance program can cause the most unplanned downtime and least predictable costs?

Options:

A.

Preventive.

B.

Predictive.

C.

Corrective.

D.

24-hour.

Question 68

What is included in contract documents specified in owner and contractor agreements?

Options:

A.

Bidding requirements

B.

Notice to bidders

C.

Specifications

D.

Shop drawings

Question 69

During the construction phase of a project you are managing, the customer wishes to add to the project scope. You think that the cost of the change is 25% greater than your contingency. What steps will you take?

Options:

A.

Get an estimate from the contractor for a change order. Also, review the impact this will have on the entire project’s cost, schedule, quality, and risks. Present these findings to the customer along with the request for additional funds.

B.

Tell the customer you may be able to accommodate their request if the contingency budget is not used for other issues. Try to cut other scope items or create savings in other parts of the project to fully fund this request.

C.

Tell the customer that their request is out of scope and cannot be accommodated. The project does not have the funds for this additional work. Explain how this request impacts schedules delaying work and adding significantly to time as well as cost.

D.

Immediately agree to add the work to your project scope without getting an estimate from the contractor to determine the additional cost. You and the contractor can work out the differences as you go along.

Question 70

You were tasked with preparing the Service Level Agreement and Key Performance Indicators for a contract. What key characteristics should you consider when writing the Key Performance Indicators (KPIs)?

Options:

A.

The KPIs must be tied to the budget.

B.

The KPIs must be easily attainable.

C.

The KPIs must measure all outcomes equally.

D.

The KPIs must be clear and understandable.

Question 71

An organization recently acquired another firm with an 88-acre campus and fourteen buildings that support government-regulated activities. The Chief Financial Officer has asked the facility manager to provide an assessment of the property and facilities. One of the assessments the facility manager will perform is the Facility Condition Index (FCI). Which has the GREATEST impact on the FCI?

Options:

A.

Utility distribution.

B.

Real estate value.

C.

Building openings.

D.

Deferred maintenance costs.

Question 72

Part of your goals is to develop a succession plan for key positions within your operation, including yourself. What is most helpful in reaching this goal?

Options:

A.

Conduct staff interviews to see who wants to be promoted.

B.

Conduct a review of staff goals and objectives.

C.

Conduct a skills gap analysis of current staff and incorporate the results into training goals.

Question 73

Which problem should you address to convey the corporate value of “community pride" to the general public?

Options:

A.

The building does not have automated control systems to increase energy efficiency.

B.

The building does not have on-site overnight on-duty security guard services.

C.

The building manager's office has worn and outdated furnishings.

D.

The exterior perimeter wall has peeling and weathered paint.

Question 74

When referring to the off-gassing of materials used within a building, what does the acronym 'VOC' stand for?

Options:

A.

Versatile ongoing commissioning.

B.

Volatile organic compounds.

C.

Voracious odor composites.

D.

Variable offensive chemistry.

Question 75

There has been a recent increase in complaints of items stolen from people's desks within a facility. What is the facility manager's initial step regarding the security of the staff and facility?

Options:

A.

Install security cameras throughout the facility to ensure you capture future incidents.

B.

Update your security procedures to ensure that staff maintain a secure desk.

C.

Investigate each case and remind staff to ensure all valuables are locked.

D.

Turn the matter over to a professional security company to lead an investigation.

Question 76

What is the most common method to accelerate the completion of a project?

Options:

A.

Outsourcing project work

B.

Reducing scope

C.

Adding resources

D.

Scheduling overtime

Question 77

What do as-built drawings document?

Options:

A.

Construction drawing bid set.

B.

Architectural drawings after design development.

C.

Field conditions after construction.

D.

Space program prior to design development.