Avaya Related Exams
76940X Exam

Which two upgrade tasks are required before upgrading the ESXi servers to 6.5? (Choose two.)
A support engineer is tasked to power down a VSP switch using the management tools available for the ACP 4200.
Which statement is true about how the engineer would accomplish this task?
To use the Management Server Console (MSC) as their time source, how would the engineer configure the ESXi hosts?