Easter Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Storage Administrator D-PVM-OE-01 Exam Dumps

Page: 5 / 12
Total 154 questions

Dell PowerMax Operate v.2 Questions and Answers

Question 17

Two PowerMax arrays have been configured for replication using SRDF During a disaster recovery operation production has been transferred to the R2 devices at the target site

Which operation allows the primary hosts to access the R1 devices without waiting for a data transfer to complete from the R2 devices'?

Options:

A.

Update

B.

Fallback

C.

Failover

D.

Resume

Question 18

In PowerMax VMAX All Flash and VMAX3 which thin provisioning component can be changed with SYMCLI or Unisphere?

Options:

A.

Storage Resource Pool

B.

Disk Group

C.

Storage Group

D.

Virtual Provisioning Pool

Question 19

Where are the Host l/Os directed to when the Storage Group is in a Non-Disruptive Migration CutoverReady state?

Options:

A.

Source array only

B.

Held in host cache

C.

Source and target arrays

D.

Target array only

Question 20

A host is connected to two PowerMax arrays with SRDF/Metro Host l/Os cannot be delivered across the SRDF link. The devices in the SRDF group have been forced into a Not Ready state to the host Which attribute is set on the SRDF group to cause this behavior?

Options:

A.

Local Link Domino

B.

Local Auto Link Recovery

C.

Update After Resume Link

D.

Limbo Period

Page: 5 / 12
Total 154 questions