Question 25

A company is preparing for a major product launch and a quarterly compliance audit. Perform a system health check to ensure that the storage array with SID - 1762 is functioning optimally, and also review the compliance status, generate and download the compliance report for all SGs.

Use the simulator to complete these tasks.

Options:

Question 26

Which service has to be manually started first when Unisphere services are down?

Options:

A.

SMASDB

B.

SYMEVENT

C.

SMAS

D.

SMI-S

Question 27

Two PowerMax arrays have been configured for replication using SRDF During a disaster recovery operation production has been transferred to the R2 devices at the target site. Which operation begins the transfer of accumulated invalid tracks from the R2s to the R1s while production work continues on the R2s?

Options:

A.

Update

B.

Fallback

C.

Resume

D.

Failover

Question 28

What is the minimum required memory and minimum required disk space to manage a maximum volume count of 64000 and 10 arrays when installing Unisphere for PowerMax?

Options:

A.

8 GB of available memory and 100 GB of available disk

B.

12 GB of available memory and 120 GB of available disk

C.

16 GB of available memory and 160 GB of available disk

D.

24 GB of available memory and 180 GB of available disk

Page: 7 / 12