Question 1

Universal Containers is building a new complex integration to a legacy system. the legacy system is also going through a major upgrade. Senior leadership has committed to the board that the combined programs will be completed on time. What is the risk with this plan?

Options:

A.

The deadline is scheduled during a Salesforce release

B.

The project team has decided to use the Waterfall methodology

C.

The legacy system team is using an Agile methodology

D.

Multiple work -streams with dependencies could impact the go-live

Buy Now
Question 2

What is the responsibility of an executive sponsor on a project?

Options:

A.

Communicate project status

B.

Determine project methodology

C.

Design executive dashboards

D.

Approve changes to project scope

Question 3

By to What three tools should an architect recommend to support application lifecycle methodology Choose 3 answers

Options:

A.

Database management systems

B.

Version control repository

C.

Middleware

D.

Continuous integration tool

E.

Issue tracking Tool

Question 4

What are three benefits of managing change with Packaged Development?

Choose 3 answers

Options:

A.

Versioning to help with change management.

B.

Making the release cycle more efficient and agile.

C.

Modular development process with specification of dependencies among packages.

D.

Manage the number of sandboxes needed to successfully deploy.

E.

Clearly divides developers and testers.

Question 5

Universal Containers (UC) is preparing for the new Salesforce release in a couple of months, and has several ongoing development projects that may be affected. Which three steps should the team at UC take to prepare for this release? Choose 3 answers

Options:

A.

Contact Salesforce to schedule a time to upgrade the full Sandbox.

B.

Refresh a Sandbox during the Release Preview Window to ensure they have the upcoming release.

C.

Run regression tests in an upgraded sandbox to detect any issues with the Upgrade.

D.

Review the release notes for automatically-enabled features and technical debt.

E.

Upgrade any SOAP integrations to the newest WSDL as early as possible

Question 6

Universal Containers (UC) is a high-tech company using SFDX tools and methodologies for its Salesforce development. T UC has moved some of its code and configuration to Unlocked Packages.

Which two best practices should an architect recommend to support UC's new package development strategy?

Choose 2 answers

Options:

A.

Version control does not need to be used, as packages manage all the code and configuration.

B.

Test developed packages in test environments before installing to production.

C.

Move everything in the existing codebase to a single monolithic package.

D.

Consult the metadata coverage report to identify features supported by packages.

Question 7

Universal Containers is a global organization that maintains regional production instances of Salesforce. One region has created a new custom object to track Shipping Containers. The CIO has requested that this new object be used globally by all Salesforce instances and further maintained and modified regionally by local administrators. Which two deployment tools will support this request? Choose 2 answers

Options:

A.

Tooling API

B.

Force.com IDE

C.

Change sets

D.

Force.com Migration Tool

Question 8

Universal Containers has recently acquired another business that uses Salesforce extensively. UC wants to merge their Salesforce Orgs to effectively sell and service customer under one business. Traditionally, UC has followed an agile development methodology to deliver Salesforce functionality. With the merging businesses, UC is convinced that adopting a Waterfall development methodology is the best approach. Which are two positive aspects of using a Waterfall development methodology?

Options:

A.

Changes late in the process are expected and can be handled by integrating them into the requirements specs.

B.

Complex processes that will need to be built are thoroughly understood and documented before coding begins.

C.

Milestones, timelines and estimates tend to be more accurate and predictable due to the upfront due diligence.

D.

The costs of starting the project are low since much of the design work is pushed to later stages of the process.

Question 9

Northern Trail Outfitter’s development team has built new features for its sales team in

the Asia-Pacific region. While testing the Apex classes, the developers are constantly hitting the governor limits.

What should the architect recommend during the review to address this issue?

Options:

A.

Use test.startTest() and test.stop Test() methods to reset governor limits.

B.

Use an AppExchange product which can temporarily increase the governor limits.

C.

Use the auto reset property to automatically reset governor limits during off-hours.

D.

Use test.setLimit() and test.resetLimit() methods to reset governor limits.

Question 10

Which statement is true for the Staging sandbox in the following diagram?

Options:

A.

When created or refreshed, the Staging sandbox is a full replica of Production

B.

The Staging sandbox is automatically refreshed on a schedule set by the administrator

C.

Salesforce major releases (e.g., Winter to Spring) always occur in Staging and Production at the same time

D.

The Staging environment can only be updated once every two weeks

Question 11

Ursa Major Solar (UMS) has used Aura components significantly in its Salesforce

application development. UMS has established a robust test framework and the development

team follows the Salesforce recommended testing practices. UMS team uses Salesforce’s test tool To check for common accessibility issues.

In which two environments the UMS team can call Aura accessibility tests?

Choose 2 answers

Options:

A.

JSTEST

B.

ACCTEST

C.

WebDriver Test

D.

AuraDriver Test

Question 12

Universal Containers (UC) is implementing Service Cloud UC's contact center receives 100 phone calls per hour and operates across North America, Europe and APAC regions. UC wants the application to be responsive and scalable to support 150 calls considering future growth. what should be recommended test load consideration

Options:

A.

Testing load considering 50% more call volume.

B.

Testing load considering half the call volume.

C.

Testing load considering 10xthe current call volume.

D.

Testing load considering current call volume.

Question 13

What is a main characteristic of an agile team?

Options:

A.

The team uses Scrum, Kanban, and Extreme Programming.

B.

The team has biweekly sprints to ensure on-time delivery.

C.

The team delivers new releases on dates defined in the beginning of the project, following a project plan

D.

The team improves and evolves its processes and frequently delivers value to the end users.

Question 14

Universal Containers (UC) started to use the GitHub workflow. For the current minor

release, an Experience Cloud developer and a Service Cloud developer both need to work on the

Case object and codes that reference the Case object. Both developers branched off the same

UCDev branch (maps to the Dev sandbox for Release Build) and started working. The

Experience Cloud development team had

Finished early, and the change was successfully merged into the UCDev branch. The local Git

branch used by the Service Cloud developer is called ServiceCase

At what point will the Service Cloud developer see the conflict and need to resolve the conflict?

Options:

A.

At command: git commit -m “Service Cloud Notes”

B.

The conflict would show in GitHub when a pull request is created from Service Case to UCDev.

C.

At command: git push origin Service Case

D.

At Command: git add force-app/main/default

Question 15

Universal Containers (UC) is looking at implementing a large number of features using an AppExchange product. This product uses Sobjects to store and configure important business

logic within the application.

Which two options should an architect recommend, as the source of truth for storing this

reference data?

Choose 2 answers

Options:

A.

Store the records in sandboxes and production.

B.

Store the records in a version control system.

C.

Use a third-party product to manage these records.

D.

Attach CSV files to the user stories in a project management system.

Question 16

Universal Containers has just initiated a project to implement partner community. The application will be deployed into a production environment currently in use by a large Salesforce user base. The project manager has insisted that the development and testing team use a single developer sandbox. What is the risk with this approach?

Options:

A.

Tester will encounter platform limits due to developer sandbox capacity limits.

B.

Testers will experience functional changes throughput testing due to not having isolation form development.

C.

Testers will hit governor limits due to large volume of users in the developer sandbox.

D.

Refreshing the developer sandbox will take significant time.

Question 17

Universal Containers has a full sandbox that will be used to analyze and fix bugs found

in production.

Which two items should the architect recommend to ensure that bugs found in production are

more easily analyzed in this full sandbox?

Choose 2 answers

Options:

A.

Refresh the full sandbox after every deployment in production.

B.

Create a daily process of copying new and changed data in production to the full sandbox.

C.

Before any deployment in production, the same process must be performed in this sandbox.

D.

Perform a Refresh Data in the full sandbox.

Question 18

Universal Containers has seven orgs in different regions. Its processes are global and standardized but each region needs the flexibility to be able to understand the global code and customize some aspects for its regions.

Which development model is optimized for this need?

Options:

A.

Use a managed package for global code and another managed package for ail regions code.

B.

Use a managed package to deploy the global code and allow local teams to request the addition of code within that package.

C.

Create a centralized Git with all the code and where the global team approves the changes made by the local teams.

D.

Use unlocked packages to deploy the global code and allow each country to create its customized unlocked package extensions,

Question 19

As a part of technical debt cleanup project, a large list of metadata components has been identified by the business analysts at Universal Containers for removal from the Salesforce org. How should an Architect manage these deletions across sandbox environments and production with minimal impact on other work streams?

Options:

A.

Generate a destructivechanges.xml file and deploy the package via the Force.com Migration Tool

B.

Perform deletes manually in a sandbox and then deploy a Change Set to production

C.

Assign business analysts to perform the deletes and split up the work between them

D.

Delete the components in production and then refresh all sandboxes to receive the changes

Question 20

Universal Containers (UC) is midway through a large enterprise project. UC is working

in an agile model, and currently has four-week iterations, with a branching strategy supporting

this approach. UC operates in a strict regulatory environment, and has dedicated teams for

security, QA, and release management. The system is live with users, and a serious production

issue is identified at the start of a sprint, which is narrowed down to a bug in some Apex code.

Which three approaches should an architect recommend to address this bug?

Choose 3 answers

Options:

A.

Investigate potential data impacts.

B.

Fix the bug in a hotfix branch.

C.

Wait until the next release to deploy the fix.

D.

Attempt to fix the bug directly in production.

E.

Seek stakeholder approval for the hotfix.

Question 21

Universal Containers is having trouble aligning releases between major, minor, and Salesforce seasonal releases.

What should an architect recommend?

Options:

A.

Gate all release decisions at the center of excellence.

B.

Create a release calendar, train and align all the teams.

C.

Share the test plans between the teams on each release type.

D.

Create a spreadsheet of metadata changes and reconcile the overlaps.

Question 22

Universal Containers is looking to construct a continuous integration process to help manage code quality. Which three tools should be used to enable this? Choose 3 answers

Options:

A.

Force.com Migration Tool

B.

Full Sandbox Environment

C.

Source Control Tool

D.

Project Management Tool

E.

Continuous Integration Build Tool

Question 23

Universal Containers has multiple projects being developed in parallel. One of the projects is in the testing phase and the testing team found a list of issues on the items that will be deployed to production. As the project deadline is short, the customer team proposes that the fixes be done in the test sandbox and then deployed to production. What should be the Architect recommend?

Options:

A.

Recommend the customer team's proposal to fix the issues in the testing environment and deploy them to production.

B.

Recommend fixing the issues in the development environment and deploying the changes to production.

C.

Recommend fixing the issues in the development sandbox, migrating them to testing, and deploy to production after testing.

D.

Recommend fixing the issues in the test environment and migrating the changes to the development sandbox.

Question 24

When replacing an old legacy system with Salesforce, which two strategies should the plan consider to mitigate the risks associated with migrating data from the legacy system to Salesforec? Choose 2 answers?

Options:

A.

Identify the data relevant to the new system, including dependencies, and develop a plan/scripts for verification of data integrity.

B.

Migrate users in phases based on their functions, requiring parallel use of legacy system and Salesforce for certain period of time.

C.

Use a full sandbox environment for all the systems involved, a full deployment plan with test data generation scripts, and full testing including integrations.

D.

Use a full sandbox environment and perform test runs of data migration scripts/processes with real data from the legacy system.

Question 25

Universal containers is looking to install a new application to enable advanced quoting in its current Professional Edition org. The org is near capacity with object and tab limits. Which two solutions should the Architect recommend? Choose 2 answers

Options:

A.

Install an Aloha certified App

B.

Upgrade to an Enterprise Edition org

C.

Create and install an unmanaged package

D.

Buy more user licenses to increase org limits

Question 26

Universal Containers (UC) has a customized repository that represents lots of different

apps or projects. UC currently is trying to shift from the org development model to the package

development model to manage changes. In the org development model, each developer starts

their work within their own personal sandbox.

When it comes to choosing development environments, what should a Salesforce architect

recommend?

Options:

A.

Start using scratch orgs because a developer can spin up a scratch org to start a new

project, start a new feature branch, or start automated Testing.

B.

Start using scratch orgs that tracks all of the changes automatically and proceed with a

staggered approach since scratch orgs can coexist with other models.

C.

Keep developing in the dev sandboxes because scratch orgs are not within the code

deployment path.

D.

Keep developing in the dev sandboxes, so that the developers feel no impact at all as they

are used to the sandbox development.

Question 27

Universal Containers (UC) is working on a project to support environmental cleanup projects with specially designed containers. To support this project, UC is developing a portal for regulatory agencies to use for tracking and reporting of the containers, and these regulatory requirements are well-defined. Many non -regulatory requirements have not been defined yet. The project is on a strict budget and timeline. Which two approaches should UC consider to meet regulatory requirements and to satisfy the needs of end users? Choose 2 answers

Options:

A.

Initiate a waterfall project and start building the features of the solution based on regulatory requirements. In parallel, gather the remaining non -regulatory requirements for the solution, then go back and reconcile the two sets of requirements and re -work the solution as necessary

B.

Initiate an Agile project, beginning with a "sprint 0" to scope and estimate the project and to build the product backlog. Identify the minimum viable product. Initiate building the solution based on the backlog, and co -create the design with the project stakeholders

C.

Initiate a waterfall project by gathering the remaining requirements and completing the architecture and design. Initiate the build/test processes with frequent reviews by the stakeholders. On build completion, perform acceptance testing and validate compliance with regulatory requirements

D.

Initiate an Agile project based on the known requirements, begin building immediately, and work through remaining requirements as they come up. Budget and timeline will not be a factor with an Agile methodology

Question 28

At any given time, Universal Containers has 10 Apex developers building new functionality and fixing bugs. Which branching strategy should an Architect recommend that mitigates the risk of developers overwriting others changes?

Options:

A.

Have all developers build new functionality in new branches, but fix bugs in the HEAD

B.

Have all developers work in the same branch, continuously testing for regressions

C.

Have developers work in separate branches and merge their changes in a common branch for testing

D.

Don't use source control. Rely on Salesforce's built-in conflict detection mechanism

Question 29

A technical lead is performing all code reviews for a team and is finding many errors and improvement points. This is delaying the team’s Deliveries.

Which two actions can effectively contribute to the quality and agility of the team?

Choose 2 answers

Options:

A.

Choose the most senior developer to help the technical lead in the code review.

B.

Create development standards and train teams in those standards.

C.

Skip the code review and focus on functional tests and UAT.

D.

Use static code analysis tool in the pipeline before manual code review.

Question 30

Universal Containers has several concurrent projects building new functionality, fixing bugs, and modifying existing functionality. Management would like features to be available to users as quickly as possible, even if the entire project is incomplete. What should an Architect recommend to maintain quality?

Options:

A.

Require developers to deploy completed code and unit tests directly to production

B.

Deploy all functionality together to ensure all functionality works together without error

C.

Use a spreadsheet to track approved changes that should be released with change sets

D.

Utilize automated source control, test, and build systems to test and deploy to production

Question 31

Universal Containers has just initiated a project involving a large distributed development and testing team. The development team members need access to a tool to manage requirements and the testing team needs access to a tool to manage defects. Additionally, stakeholders are requesting ad -hoc status reports. What tool should an Architect recommend to support the project?

Options:

A.

Spreadsheets

B.

Code Repository

C.

Wave

D.

Port management tool

Question 32

Which two project situations favor an Agile methodology? Choose 2 answers

Options:

A.

A digitization project to update an existing customer -facing process and enable quick adjustments

B.

A project to be executed by a third party, with a fixed and formal scope, budget, and timeline

C.

An environment with a heavy investment in DevOps capabilities for rapid testing and deployment

D.

A project with well-defined requirements and complex interactions between front- and back -end systems

Question 33

Universal containers has proposed using a Developer Edition org to stage changes to their Customer Community, which includes multiple custom Visualforce pages and components. Which three risks should a Technical Architect consider in this strategy? Choose3 answers

Options:

A.

Code changes cannot be deployed from a Developer Sandbox to Production.

B.

Developer Edition orgs have limited user counts and low data volume limits, which will make User Testing difficult.

C.

Developer Edition orgs cannot have sandboxes, which will make team development difficult.

D.

Developer Edition orgs do not run on production servers and will not perform well during testing.

E.

Changes Sets cannot be used to deploy from Developer Edition to Production which will make deployment more complex

Question 34

What are the three considerations that the architect should recommend for Change Set

deployment?

Choose 3 answers

Options:

A.

Change Sets cannot be automated.

B.

Change Sets cannot be validated before deployment

C.

Change Sets cannot be used for orgs affiliated with same production org.

D.

Change Sets cannot be rolled back.

E.

Change Sets cannot be reused between Production Salesforce orgs.

Question 35

Universal Containers (UC) has used Salesforce for the last 6 years with 50% custom code. UC has recently implemented continuous integration. UC wants to improve old test classes whenever new functionality invalidates tests. UC also wants to reduce the deployment time required. What should Architect recommend?

Options:

A.

A Do not execute any test classes in sandboxes and production.

B.

Do not execute test classes in sandboxes and all test classes in Production.

C.

Test classes cannot be executed in sandboxes.

D.

Execute all test classes in sandboxes and select test classes in Production.

Question 36

UniversalContainers (UC) is using custom metadata types to control the behavior of a

few of the custom functionalities. UC wants to

Deploy custom metadata types to production using Metadata API.

Which two data types does UC need to include?

Choose 2 answers

Options:

A.

CustomMetadataType

B.

CustomMetadata

C.

CustomObject

D.

Custom Field

Question 37

Universal Containers (UC) currently uses the org development model and utilizes the Salesforce CLI as the deployment tool. After the feature release artifact (a .zip file) has been tested in a lower sandbox, it is being deployed to the full sandbox for performance testing and production deployment readiness check-Since quick deployment options are not being used, what is the correct way to deploy the artifact to the full sandbox?

Options:

A.

Authorize to the Full sandbox org; Validate with sfdx:source:deploy; On successful validation, deploy with sfdx:source:deploy

B.

Authorize to the Fullsandbox org; Validate with sfdximdapi:deploy; On successful validation, deploy with sfdx:mdapi:deploy

C.

Authorize to the Full sandbox; validate with sfdx: source: deploy; On successful validation, deploy with sfdx;mdapi;deploy

D.

Authorize to the Full sandbox org; Validate with sfdx:mdapi:deploy; On successful validation, deploy with sfdx:source:deploy

Question 38

Universal Containers has just completed several projects, including new custom objects and custom fields. Administrators are having difficulty maintaining the application due to not knowing how objects and fields are being used. Which two options should an Architect recommend? Choose 2 answers

Options:

A.

Create Design standards to require help text on all custom fields and custom objects.

B.

Create Design standards to consistently use the description field on custom objects.

C.

Create Design standards with a document to store all custom objects and custom fields

D.

Create Design standards to require all custom fields on all custom object page layouts

E.

Create Design standards to consistently use the description field on custom fields.

Question 39

Metadata API supports deploy () and retrieve () calls for file-based deployment.

Which two scenarios are the primary use cases for writing code to call retrieve () and deploy ()

methods directly?

Choose 2 answers

Options:

A.

Team development of an application in a Developer Edition organization. After completing development and testing, the application is Distributed via Lightning Platform AppExchange.

B.

Development of a custom application in a scratch org. After completing development and testing, the application is then deployed into an upper sandbox using Salesforce CLI(SFDX)

C.

Development of a customization in a sandbox organization. The deployment team then utilize the Ant Migration Tool to deploy the customization to an upper sandbox for testing.

D.

Development of a custom application in a sandbox organization. After completing development and testing, the application is then deployed into a production organization using Metadata API.

Question 40

Universal Containers recently added a new sales division to ensure that Record Type IDs match both products migrating to Production, the Developer reports that Unit Tests are failing. What should an Architect do to ensure tests execute predictably?

Options:

A.

Ensure that Record Type IDs match both Production and Sandbox orgs

B.

Ensure executed Apex test run as valid users

C.

Ensure unit tests generate their own test data

D.

Ensure unit tests execute with see AllData=true

Question 41

Universal Containers CUC) is hiring offshore agile development teams to decrease costs and enhance UC's capability of delivering new features to its customers. However, the CTO Is not able to follow or measure the work of those teams.

What should an architect recommend to increase transparency?

Options:

A.

Schedule a daily stand-up meeting with representatives of all offshore teams to share the progress of the teams.

B.

Request the offshore teams to send daily emails to the CTO with the progress of the teams.

C.

Ask the offshore teams to add their progress and status in a shared spreadsheet.

D.

A Request the offshore teams to share their work in progress in a virtual Kanban board tool.

Question 42

Universal Containers (UC) has been using Salesforce Sales Cloud for many years

following a highly customized, single-org strategy with great success so far.

What two reasons can justify a change to a multi-org strategy?

Choose 2 answers

Options:

A.

UC is launching a new line of business with independent processes and adding any new feature to it is too complex.

B.

UC wants to use Chatter for collaboration among different business units and stop working in silos.

C.

UC follows a unification enterprise architecture operating model by having orgs with the same processes implemented foreach business unit.

D.

Acquired company that has its own Salesforce org and operates in a different business with its own set of regulatory requirements.

Question 43

Universal Containers (UC) has a huge volume of metadata that cannot be deployed at once. What is the recommended strategy for UC to be successful with the deployment?

Options:

A.

Identify metadata dependencies, create logical groupings, and deploy in the right order.

B.

Use a continuous integration tool such as Jenkins to deploy in the right order.

C.

Sort and group the metadata alphabetically and deploy them in the same order.

D.

Use a combination of the Ant migration tool and change sets for deployment.

Question 44

Universal Containers (UC) has multiple development teams that work on separate streams of work, with different timelines. Each stream has different releases of code and config, and thedelivery dates differ between them.

What is a suitable branching policy to recommend?

Options:

A.

Leaf-based development

B.

Trunk-based development

C.

GitHub flow

D.

Scratch-org-based development

Question 45

Universal Containers (UC) is planning for a huge data migration as part of their Service Cloud implementation. UC, has approximately 15million customers, 30 million contacts, and 30 million active cases. Which two key areas of UC's data migration test plan should be included? Choose 2 answers

Options:

A.

API's to be used for data migration.

B.

Success criteria for data migration.

C.

Target Salesforce Server and Source system IP address.

D.

Manual and Automated data validation approaches.

Question 46

Universal Containers (UC) has many different business units, all requesting new projects to be built into a single Salesforce Org. UC management is concerned with a lack of appropriate project properties and roadmap for the Salesforce ecosystem. What should an Architect recommend?

Options:

A.

Use design Standards for Governance.

B.

Create a Center of Excellence with a charter document.

C.

Create a Release Management Process.

D.

Create project charters for each project.

Question 47

Universal Containers have just acquired Planetary storage. Both companies use salesforce.com to manage their sales activities. The two companies have many customers in common and the company plans to merge the two sales organizations, but the products and sales processes between the two original companies will remain different and distinct. What factor should the company consider in merging the two Salesforce.com orgs into a single org?

Options:

A.

Transactional sales data could be combined without modification since standard objects are used

B.

Salespersons selling both product lines would need two logins, once for each product line

C.

Business processes on standard objects can be merged without modifications

D.

Customer data could be merged with modifications using standardization and de -duplication

Question 48

Which are two recommended methods of creating test data in Salesforce?

Choose 2 answers

Options:

A.

Utilize Heroku Connect to provide test class data.

B.

Host a mock endpoint to produce sample information from an endpoint.

C.

Reference data from middleware directly within your test class.

D.

Load a CSV as a static resource and reference it in a test class.

Question 49

A year has passed since a project has gone live and a developer is looking to make an update to an existing Apex class, but is unsure of its purpose. What artifact from the original project should be leveraged to determine the purpose of the class?

Options:

A.

User Acceptance Test Scripts

B.

Test Execution Plan

C.

Requirements Traceability Matrix

D.

Test Sign Off Document

Question 50

Universal Containers is having trouble deploying metadata from SIT to UAT. UAT is

complaining that it does not recognize some new Salesforce metadata types to be deployed. The deployment from Dev to SIT worked perfectly

What could be the problem?

Options:

A.

There is no problem, this is expected behavior.

B.

UAT is on a preview release and SIT is not.

C.

SIT is on a preview release and UAT is not.

D.

Use the DX command line instead.

Question 51

Northern Trail Outfitters (NTO) has well-defined release management processes for both large and small projects. NTO's development team created a workflow and a trigger for the changes in its opportunity renewal process.

What should the architect recommend for release planning of these changes?

Options:

A.

Plan this as a patch release and align with the Salesforce patch release.

B.

Plan this as a major release and align with a Salesforce major release.

C.

Plan this as a minor release with training and change management.

D.

Plan this an interim release after checking with Salesforce support.

Question 52

Universal Containers (UC) has created a custom REST web service. This web service receives Orders and Order Line Items data from an external endpoint and runs business logic and validations on it before inserting it into the database. UC is expecting to receive more than 100K orders a day and each order can have up to 10-line items. Each inbound request will contain only one order and its corresponding line items.

What two testing types should an architect recommend to ensure users don't face platform slowdowns during peak business hours? Choose 2 answers

Options:

A.

Stress Testing

B.

Unit Testing

C.

Load Testing

D.

Performance Testing

Question 53

Universal Containers CUC) is embarked on a large Salesforce transformation journey, UC's DevOps team raised a question about tracking Salesforce metadata throughout the development lifecycle across sandboxes all the way to production.

As the deployment architect of the project, what should be the recommendation to track which version of each feature in different environments?

Options:

A.

Use an Excel sheet to track deployment steps and document the SFDX commands.

B.

Use an AppExchange or third-party tool that is specialized in Salesforce deployment.

C.

Use Change Set to track deployed customizations.

D.

Use Salesforce SFDX commands to deploy to different sandboxes.

Question 54

Salesforce has three major releases a year.

Which type of change introduced by a release can cause automated browser tests to need updating?

Options:

A.

DOM changes

B.

New standard fields

C.

Metadata schema changes

D.

New Apex methods

Question 55

Cloud Kicks (CK) is launching a new sneaker line during the upcoming holiday season and needs to do a thorough batch data testing before Go-Live. CK is using Salesforce unlimited edition.

What two sandbox types should the architect recommend for batch data testing?

Choose 2 answers

Options:

A.

Developer Pro sandbox

B.

Partial Copy sandbox

C.

Developer sandbox

D.

Full sandbox

Question 56

Universal Containers is planning to release simple configuration changes and enhancements to their Sales Cloud. A Technical Architect recommend using change sets. Which two advantages would change sets provide in this scenario? Choose 2 answers

Options:

A.

An easy way to deploy related components.

B.

The ability to deploy a very large number of components easily.

C.

A simple and declarative method for deployment.

D.

The ability to track changes to component.

Question 57

Universal containers have recently replaced a custom service center application with Salesforce Service Cloud. Administrators are now confused about which fields and classes are actively being utilized and how future implementations can be maintained. Choose 2 answers

Options:

A.

Create an adoption plan for end users using Salesforce dashboards and reports.

B.

Create a design standard requiring integration to use declarative configurations patterns

C.

Create a governance process requiring all projects to create project deliverable documentation.

D.

Create a standard method for deprecating classes and fields using design standards.

E.

Create a governance framework focused on high-level business strategy and goals.

Question 58

Universal Containers has a deadline to retire a business -critical application that will no longer be supported on a specific date. What should an Architect recommend?

Options:

A.

Executive Leadership

B.

Requirements Traceability Matrix

C.

Business Continuity Plan

D.

Agile Methodology

Question 59

Universal Containers (UC) innovative apps division is releasing an application that can

be installed in its trading partners Salesforce environments. The application lets the trading

partners book containers from UC directly without leaving their own Salesforce environment.

The partners can then build on top of the application with process builders and triggers so the

container booking process can be integrated with the trading partners’ own processes.

What is the recommended mechanism for releasing the application considering the innovative

apps division wants to keep the application up to date in various environments?

Options:

A.

Change sets

B.

Unmanaged package

C.

Managed package

D.

Zip file deployable by SFDX or ANT

Question 60

Universal Containers has many backlog items and competing stakeholders who cannot agree on priority.

What should an architect do to overcome this?

Options:

A.

Facilitate the design of a prioritization model with the stakeholders.

B.

Organize a sprint planning meeting with the Scrum team.

C.

Take over prioritization for the stakeholders.

D.

Allow the delivery teams to pick the best work for the business.

Question 61

Which two statements are accurate about why Mock objects are needed when writing test classes?

Choose 2 answers

Options:

A.

Mock can also be used on the classes that extend the batchable interface to bypass the batch jobs.

B.

Using a Mock allows the test class to bypass the dependencies of other objects, methods, state, or behaviors. Therefore, the developer has total control of his own code.

C.

Some methods are invoking long running processes, using Mock is a shortcut of bypassing the long executions.

D.

A Mock is needed whenever the code makes an HTTP callout.

Question 62

What are three advantages of using the SFDX?

Choose 3 answers

Options:

A.

Can store code on a local machine, or a version control system.

B.

Can quickly deploy metadata using Execute Anonymous.

C.

Can create scratch orgs.

D.

Can use native Deployment Rollback Tool to quickly revert to prior state.

E.

Can Install application metadata from a central repository.

Question 63

Universal Containers (UC) has multiple teams with major projects working

concurrently in their own developer sandboxes. After deploying to production, a bug is

discovered. Due to tight timelines, the development team has suggested correcting the bug in the user acceptance testing (UAT) environment, which is a full copy sandbox.

What should the architect recommend?

Options:

A.

UC should spin up a new sandbox to use as a hot fix environment. Once the bug is corrected, the change should be applied to production and downstream environments.

B.

The fix should be made in the developer environment where the project work was done. Once the fix has been made, it should go through a full deployment/testing process and adhere to the normal project cadence.

C.

Since the issue was found in production, it should be treated as a change request and go into the backlog as an enhancement.

D.

Correcting the bug in UAT is ideal. Since UAT is a full copy, it will be the fastest location to fix and test the resolution.

Question 64

Universal Containers requires that all sandboxes that have not been recently refreshed must also receive the newest changes to production. This must be done before any functionality from that environment can be moved to production. Which deployment tool would allow this deployment process to be managed in an automated fashion?

Options:

A.

Workbench

B.

Force.com Migration Tool

C.

Change Sets

D.

Force.com IDE

Question 65

Universal Containers (UC) is implementing a governance framework and has asked the Architect to make recommendations regarding release planning. Which two decisions should the Architect make when planning for releases? Choose 2 answers

Options:

A.

How to test existing functionality to ensure no regressions are introduced.

B.

Whether Salesforce will wait to upgrade the pod until after a UC release is complete.

C.

How to roll back to the previous Salesforce release if there are issues.

D.

When to test a new UC feature release if there are issues.

Question 66

Universal Containers (UC) has been following the Waterfall methodology to deliver customer apps in Salesforce. As the business is growing at scale and with demand to incorporate features and functionality at faster pace, UC is finding the Waterfall approach is not an optimal process, and intends to transition towards an agile development methodology. Which are the two strengths of using an agile development methodology? Choose 2

Options:

A.

Careful documentation is done at each step of the process so a target body of knowledge is available for inspection.

B.

There are many small releases of functional code, allowing stakeholders to see and touch the work in progress.

C.

All elements of the build are fully understood before work begins, reducing risk of unpleasant surprises.

D.

The project requirements in later phases are expected and accommodated by the process, by design.

Question 67

Universal Containers has many development teams deploying into a single org. The

business is very seasonal and approaching its busiest season. The business owner comes to you

asking for your advice about its next major production release.

What best practice should an architect recommend?

Options:

A.

Make declarative changes in production only.

B.

Bypass regression testing for minor changes.

C.

Avoid releasing near peak business periods.

D.

Developers should conduct user acceptance testing

Development-Lifecycle-and-Deployment-Architect Question Answers