New Year Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

USGBC LEED-Green-Associate Online Access

LEED Green Associate Exam (LEED GA) Questions and Answers

Question 29

Which of the following Is a source of green power?

Options:

A.

Clean coal

B.

Wind turbine

C.

Nuclear fission

D.

Natural gas captured by hydraulic fracturing

Question 30

In order to earn LEED certification, a project must

Options:

A.

employ a LEED AP on its project team

B.

conduct a whole-building life-cycle assessment

C.

earn a minimum 0t 50 points or meet a prerequisite

D.

satisfy all prerequisites and earn a minimum number of points

Question 31

For benchmarking purposes, a baseline building performance is evaluated (by means of energy simul-ation model), as defined in

Options:

A.

ASHRAE 55-2010

B.

ASHRAE 52.2-2007

C.

ASHRAE 62 1-2010

D.

ASHRAE 90.1-2010. Appendix G

Question 32

During the pre-design phase of a three-story office building, the project team determines that the anticipated energy use of the proposed building will exceed the Owner's Project Requirements (OPR). What strategy should the project team consider in order to lower the building's energy use?

Options:

A.

Increase the square footage of the building

B.

Maximize daylighting opportunities with properly sized and oriented windows

C.

Use valid survey protocols to assess occupants' satisfaction with the indoor environment

D.

Monitor and verity performance to ensure that building systems are functioning as designed