New Year Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Pass Using LEED-Green-Associate Exam Dumps

LEED Green Associate Exam (LEED GA) Questions and Answers

Question 69

At what phase should the charrette take place?

Options:

A.

Post commissioning

B.

During the design process

C.

At the Beginning of the project

D.

During the construction process

Question 70

The range of points required to maintain Gold level of LEED certification is

Options:

A.

40-49

B.

50-59

C.

50-69

D.

60-79

Question 71

What is considered as the receptacle load?

Options:

A.

The electrical current drawn by regulated and non-regulated receptacles

B.

The electrical current drawn by the individual receptacle connected to a standby battery

C.

The electrical current Which is non-regulated and has major impact on the load 0t the overall network

D.

The electrical current drawn by all equipment that is connected to the electrical system via a wall outlet

Question 72

Installing which of the following will increase the quantity of the rainwater that is discharged from a site?

Options:

A.

Vegetated roof

B.

Porous pavers for parking lots

C.

Concrete sidewalks and parking areas

D.

Bioswales and ram gardens with native plants