Question 13

Best practices recommend that the LEED AP confirm that minimum program requirements have been met

Options:

A.

as part of the discovery phase

B.

as part of the final certification submittal

C.

after the design phase but before construction

D.

after the Commissioning (Cx) review but before design phase submittal

Question 14

The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will

Options:

A.

be advertised as LEED compliant

B.

be both water efficient and high performing

C.

comply with mandatory federal government regulations

D.

comply with all international plumbing system requirements

Question 15

After the construction and installation of all finishes and furnishing of a new 36,000 ft2 (3 344.5m2) office space, what is the minimum total volume of outdoor air that is required during a non-phased flush-out procedure to achieve Indoor Environmental Quality Credit, Indoor Air Quality Assessment?

Options:

A.

126,000,000 ft3 (3 567 922.7 m3)

B.

378,000,000 ft3 (10 703 768.1 m3)

C.

504,000,000 ft3 (14 271 690.7 m3)

D.

522,000,000 ft3 (14 781 394.0 m3)

Question 16

A project team chooses to pursue the Integrative Process Credit. Which of the following credits can be affected by early planning? (Choose One Answer only)

Options:

A.

Location and Transportation Credit, Access to Quality Transit

B.

Energy and Atmosphere Credit, Green Power and Carbon Offsets

C.

Indoor Environmental Quality Credit, Indoor Air Quality Assessment

D.

Energy and Atmosphere Credit, Advance Energy Metering