Passed Exam Today LEED-AP-ID+C

LEED AP Interior Design + Construction (LEED AP ID+C) V4 Questions and Answers

Question 9

A renovation project includes both a new kitchen sink and shower and an existing lavatory and water closet within the LEED project boundary. How would the project perform the Water Efficiency Credit, Indoor Water Use Reduction calculations?

Options:

A.

Include only the newly installed fixtures and exclude the existing fixtures

B.

Include only the existing fixtures and exclude the newly installed fixtures

C.

Include all fixtures (new and existing); the baseline for the existing fixtures would be the flush/flow rates of the existing fixtures prior to retrofit

D.

Include all fixtures (new and existing); the baseline for the existing fixtures would be the same baseline flush/flow rates used for the new fixtures

Question 10

A project consists of both retail and office space. When deciding which LEED Interior Design and Construction rating system to use, the LEED AP should follow which of the following rules?

Options:

A.

If a rating system is appropriate for less than 50% of the gross area of the LEED project space, then the rating system should not be used

B.

If a rating system is appropriate for more than 50% of the gross floor area of LEED project space, then that rating system should be used

C.

If a rating system is appropriate for 50% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

D.

If a rating system is appropriate for 40% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

Question 11

A project needs 5,000 ft2 (464.5 m2) of raised flooring. The tenant wants to refurbish and install an existing raised floor from another building as part of the project. If this material will equate to 14% of the overall project materials cost, which credit would this contribute towards?

Options:

A.

Innovation Credit, Option 1. Innovation

B.

Materials and Resources Credit, Construction and Demolition Waste Management

C.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices

D.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 1. Raw Material Sourcing and Extraction Disclosure

Question 12

Which of the following prerequisites or credits is affected by using plug-in devices when attempting to achieve Indoor Environmental Quality Credit, Thermal Comfort?

Options:

A.

Energy and Atmosphere Credit, Demand Response

B.

Energy and Atmosphere Credit, Advanced Energy Metering

C.

Energy and Atmosphere Prerequisite, Minimum Energy Performance

D.

Energy and Atmosphere Prerequisite, Building Level Energy Metering