A renovation project includes both a new kitchen sink and shower and an existing lavatory and water closet within the LEED project boundary. How would the project perform the Water Efficiency Credit, Indoor Water Use Reduction calculations?
A project consists of both retail and office space. When deciding which LEED Interior Design and Construction rating system to use, the LEED AP should follow which of the following rules?
A project needs 5,000 ft2 (464.5 m2) of raised flooring. The tenant wants to refurbish and install an existing raised floor from another building as part of the project. If this material will equate to 14% of the overall project materials cost, which credit would this contribute towards?
Which of the following prerequisites or credits is affected by using plug-in devices when attempting to achieve Indoor Environmental Quality Credit, Thermal Comfort?