Winter Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

Huawei HCIP-Data Center Facility-BFDO H12-425 New Questions

Page: 2 / 9
Total 240 questions

HCIP-Data Center Facility Deployment Questions and Answers

Question 5

FusionModule1000A series solution meets the TIER 4 requirements if it adopts 2N power supply and distribution system.

Options:

A.

TRUE

B.

FALSE

Question 6

Huawei NetCol5000-A line-level precision air conditioner mainly solves the hot issue of high-density data center

Options:

A.

TRUE

B.

FALSE

Question 7

In the water-side free cooling solution, cold water can be transported directly from the cooling tower to chilled water air conditioner.

Options:

A.

TRUE

B.

FALSE

Question 8

After all the NetEco monitoring cables are connected, users need to check ( ).

Options:

A.

Power cables and signal cables are bound separately.

B.

Proper redundancy is reserved at connectors of signal cables.

C.

Signal cable connectors are intact.

D.

Proper redundancy is reserved at the turning point for signal cables.

Page: 2 / 9
Total 240 questions