Winter Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

Note! Following H12-425 Exam is Retired now. Please select the alternative replacement for your Exam Certification. The new exam code is H12-425_V2.0

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

HCIP-Data Center Facility Deployment Questions and Answers

Question 1

After all the NetEco monitoring cables are connected, users need to check ( ).

Options:

A.

Power cables and signal cables are bound separately.

B.

Proper redundancy is reserved at connectors of signal cables.

C.

Signal cable connectors are intact.

D.

Proper redundancy is reserved at the turning point for signal cables.

Buy Now
Question 2

The height of the ECC800 collector is () U.

Options:

A.

1

B.

2

C.

3

D.

4

Question 3

Power segment function is enabled on UPS2000-G-20kVA. Which will cause the loads connected with PL terminals power- off?

Options:

A.

Overload

B.

Battery under voltage

C.

Mains input interruption

D.

Mains Under voltage