Question 21

A system has a self-diagnostics module that starts executing after the system is reset. The diagnostics are running 12 different tests on the systems memory hardware. The following is one of the requirements set for the diagnostics module:

'The time taking the diagnostics tests to execute shall be less than 2 seconds' Which of the following is a failure related to the specified requirement?

Options:

A.

The diagnostic tests fail to start after a system reset

B.

The diagnostic tests take too much time to execute

C.

The diagnostic tests that measure the speed of the memory, fail

D.

The diagnostic tests fail due to incorrect implementation of the test code

Question 22

Consider a review for a high-level architectural document written by a software architect. The architect does most of the review preparation work, including distributing the document to reviewers before the review meeting. However, reviewers are not required to analyze the document in advance, and during the review meeting the software architect explains the document step by step. The only goal of this review is to establish a common understanding of the software architecture that will be used in a software development project.

Which of the following review types does this review refer to?

Options:

A.

Inspection

B.

Audit

C.

Walkthrough

D.

Informal review

Question 23

Test automation allows you to:

Options:

A.

demonstrate the absence of defects

B.

produce tests that are less subject to human errors

C.

avoid performing exploratory testing

D.

increase test process efficiency by facilitating management of defects

Question 24

A virtual service emulating a real third-party service and the automated test scripts (aimed at testing the system under test) that interact with that service, are test work products that are typically created during:

Options:

A.

Test monitoring and control

B.

Test implementation

C.

Test design

D.

Test analysis