Following a risk-based testing approach you have designed 10 tests to cover a product risk with a high-risk level. You want to estimate, adopting the three-point test estimation technique, the test effort required to reduce the risk level to zero by executing those 10 tests. You made the following three initial estimates:
• most optimistic = 6 person hours
• most likely = 30 person hours
• most pessimistic = 54 person hours
Based only on the given information, which of the following answers about the three-point test estimation technique applied to this problem is true?
Which ONE of the following options identifies the acceptance criteria that has NOT been fully covered during the above test cycle?
A typical objective of testing is to ensure that: