New Year Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

CTFL_Syll_4.0 Exam Dumps : ISTQB Certified Tester Foundation Level (CTFL) v4.0

PDF
CTFL_Syll_4.0 pdf
 Real Exam Questions and Answer
 Last Update: Dec 26, 2025
 Question and Answers: 200 With Explanation
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
CTFL_Syll_4.0 exam
PDF + Testing Engine
CTFL_Syll_4.0 PDF + engine
 Both PDF & Practice Software
 Last Update: Dec 26, 2025
 Question and Answers: 200
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
CTFL_Syll_4.0 Engine
 Desktop Based Application
 Last Update: Dec 26, 2025
 Question and Answers: 200
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

What our customers are saying

Marshall Islands certstopics Marshall Islands
Julian
Oct 20, 2025
I used exam dumps as a way to refresh CTFL_Syll_4.0 examconcepts quickly. It worked like a charm.

ISTQB Certified Tester Foundation Level (CTFL) v4.0 Questions and Answers

Question 1

Consider an estimation session in which a six-member Agile team (Membl,..., Memb6) uses the planning poker technique to estimate a user story (in story points). The team members will use a set of cards with the following values: 1. 2, 3, 5, 8,13, 21. Below is the outcome of the first round of estimation for this session:

Membl = 3 Memb2 = 3 Memb3 = 3

Memb4 = 21 Memb5 = 3 Memb6 = 1

Which of the following answers best describes how the estimation session should proceed?

Options:

A.

The final estimate of the user story in story points is determined by applying the three-point estimation technique with the following input values: most optimistic estimate = 1, most likely estimate = 3, and most pessimistic estimate = 21

B.

Further estimation rounds should be performed until all team members will pick the card having the same value: this value will represent the final estimate of the user story in story points

C.

The final estimate of the user story in story points is determined by calculating the average value between the most optimistic estimate of 21 story points (Memb4) and the most pessimistic estimate of 1 story point (Memb6)

D.

Memb6 and Memb4 which have produced the most pessimistic and the most optimistic estimates respectively, should explain the reasons of their choices to stimulate a discussion between all members before to proceed to another estimation round

Buy Now
Question 2

For each test case to be executed, the following table specifies its dependencies and the required configuration of the test environment for running such test case:

Assume that CONF1 is the initial configuration of the test environment. Based on this assumption, which of the following is a test execution schedule that is compatible with the specified dependencies and allows minimizing the number of switches between the different configurations of the test environment?

Options:

A.

TC4, TC3, TC2, TC1.TC5

B.

TC1.TC5.TC4. TC3, TC2

C.

TC4, TC3. TC2, TC5, TC1

D.

TC4.TC1, TC5. TC2.TC3

Question 3

Which of the following is NOT a typical debugging activity when a failure is triggered by dynamic testing?

Options:

A.

Reproducing the failure

B.

Adding new test cases

C.

Fixing the cause

D.

Diagnosing the root cause