iSQI Related Exams
CTFL_Syll_4.0 Exam
An anti-intrusion system is battery powered and is activated by pressing the only available button. To deactivate the system, the operator must enter a PIN code. The system will stay in alert mode within a configurable timeout and an alarm bell will ring if the system is not deactivated before the timeout expires. The following state transition diagram describes the behavior of the system:

What is the minimum number of test cases needed to cover every unique sequence of exactly 4 states/3 transitions starting and ending in the “Inactive” state? (note that “Inactive” is not a final state in the diagram)
Mark the correct sentences:
* Defects are a result of environmental conditions and are also referred to as "Failures"
* A human mistake may produce a defect
* A system mil totally fail to operate correctly when a failure exists in it
* When a defect exists in a system it may result in a failure
* Defects occur only as a result of technology changes
Which ONE of the following options corresponds to an activity in the testing process in which testable features are identified?