The following table is stored in a variable called "dt".
What will the value of the qty variable be after executing the Assign activity?
A developer needs to prioritize automating several processes. To help prevent any long-term maintenance, which process attribute should be avoided?
A developer has opened a pre-existing workflow that utilizes UI Automation within Google Chrome, but the Google Chrome extension has not been installed on their computer.
What steps should the developer take to install the Google Chrome extension from UiPath Studio?
Instructions: Drag the Description found on the left and drop it on the correct Step Sequence found on the right.
What is the use of job priorities in unattended automations within UiPath Orchestrator?