Month End Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

RCDDv14.1 Exam Dumps : BICSI Registered Communications Distribution Designer - RCDDv14.1

PDF
RCDDv14.1 pdf
 Real Exam Questions and Answer
 Last Update: Jan 30, 2025
 Question and Answers: 320
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
RCDDv14.1 exam
PDF + Testing Engine
RCDDv14.1 PDF + engine
 Both PDF & Practice Software
 Last Update: Jan 30, 2025
 Question and Answers: 320
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
RCDDv14.1 Engine
 Desktop Based Application
 Last Update: Jan 30, 2025
 Question and Answers: 320
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

BICSI Registered Communications Distribution Designer - RCDDv14.1 Questions and Answers

Question 1

The options for termination an unshielded twisted pair cable for a video surveillance camera at the camera end are an 8-pin 8 conductor outlet and

Options:

A.

8-pin 8-contact plug.

B.

75 ohm balun

C.

50 ohm balun

D.

biscuit jack

E.

shielded RJ-45 connector

Buy Now
Question 2

The MINIMUM required for backbone floor to floor pathways is five (5) sleeves each being 103 mm (four trade size) in diameter What increase in usable floor space should another 103 mm (four trade size) sleeve be added?

Options:

A.

=929 m2 (10,001 ft2)

B.

=1858m2 (20,001 ft2)

C.

=3716 m2 (40,001 ft2)

D.

=4645 m2 (50,001 ft2)

Question 3

Which of the following serves as a guiding principle for a program manager when preparing a program work breakdown structure?

Options:

A.

Decompose the program work based upon available resources

B.

Decompose the program to the work package level

C.

Decompose the program lo the architecture baseline level

D.

Decompose the program at a level sufficient to achieve control