HP Related Exams
HPE0-S58 Exam
An integrator is validating an HPE Synergy solution design for a customer that has the following requirements:
The compute modules boot from a 3PAR array connected to the Synergy Interconnect modules through a pair of Brocade Fibre Channel switches.
Which components must be part of the solution? (Choose two.)
An integrator has planned a highly available Synergy Composable Fabric with 20Gb Interconnect Link Modules.
What is the maximum number of SY 480 Gen10 compute modules the integrator can install into this configuration?
A customer has the following HPE Synergy solution:
Click the menu option the integrator should use to add more uplinks ports from HPE Virtual Connect SE 32 Gb FC modules to SAN uplink set.