New Year Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Free and Premium HP HPE0-S58 Dumps Questions Answers

Page: 1 / 4
Total 97 questions

Implementing HPE ComposableInfrastructure Solutions Questions and Answers

Question 1

A customer is considering implementing a DRS cluster, but they would like to know how DRS can help to achieve performance goals.

How should an integrator respond?

Options:

A.

When powering on a virtual machine, a DRS cluster can automatically place it on the optimal host.

B.

Selected virtual machines will be assigned higher priority when the amount of physical resources will drop below a specific level.

C.

A DRS cluster will migrate a virtual machine to a different host when available network bandwidth will drop below a specific level.

D.

If more than 50 virtual machines will be running on a single host, DRS cluster will configure CPU affinity to proportional resource allocation.

Buy Now
Question 2

Refer to the exhibit.

A customer has an HPE Synergy 2-frame configuration, as shown. The customer has a new project and needs to increase the number of compute modules.

What is the maximum number of compute nodes that the customer’s fabric could support?

Options:

A.

24

B.

36

C.

48

D.

60

Question 3

Which HPE Synergy D3940 storage module configuration is valid?

Options:

A.

a single RAID set to be shared across the SAS fabric to multiple compute nodes as a virtualization host datastore

B.

maximum of three HPE Synergy D3940 storage modules per frame to be used by any compute module within the management ring

C.

any number of the drives from storage module to be mapped to any single compute node

D.

a pair of disks to house Composer backups and Synergy firmware bundles

Question 4

A customer has the following HPE Synergy solution:

  • three Synergy frames
  • two HPE Virtual Connect SE 32Gb Fibre Channel (FC) modules in each time
  • two HPE Virtual Connect SE 40GB F8 modules
  • four HPE Synergy 10Gb Interconnect Link Modules

Click the menu option the integrator should use to add more uplinks ports from HPE Virtual Connect SE 32 Gb FC modules to SAN uplink set.

Options:

Question 5

An integrator has planned a highly available Synergy Composable Fabric with 20Gb Interconnect Link Modules.

What is the maximum number of SY 480 Gen10 compute modules the integrator can install into this configuration?

Options:

A.

24

B.

36

C.

48

D.

60

Question 6

Which storage solution can be used for volume provisioning using HPE Composer?

Options:

A.

HPE XP7 Storage

B.

HPE Nimble Storage

C.

HPE MSA 2040

D.

HPE StoreEasy 1560

Question 7

Using a laptop, how can an integrator perform the initial setup on an HPE Synergy 12000 Frame?

Options:

A.

Connect a CAT5 cable to the MGMT port of the top Frame Link Module, and connect to the HPE Synergy console with VNC to the address 306.025 port 5900.

B.

Connect a CAT5 cable to the front panel module, use the HPE Synergy default IP address of 192.168.10.1, port 5900, and connect to the HPE Synergy console with a web browser.

C.

Connect a CAT5 cable to the MGMT port of the top Frame Link Module, and connect to the HPE Synergy console with a web browser to the address 192.168.10.1, port 5900.

D.

Connect a CAT5 cable to the front panel module, use the HPE Synergy default IP address of 192.168.10.1, port 5900, and connect to the HPE Synergy console with VNC.

Question 8

A customer needs to significantly improve I/O performance to a database server.

Which product should an integrator implement as part of a Synergy composable solution?

Options:

A.

HPE Synergy D3940 storage module with SSD drives

B.

HPE Composer with NVMe drives

C.

HPE Synergy compute module with a Tesla accelerator

D.

HPE Synergy Image Streamer

Question 9

An integrator is validating an HPE Synergy solution design for a customer that has the following requirements:

  • 20 half-height compute modules
  • 2x 20Gb connectivity to each compute module
  • single fabric domain for LAN and SAN connectivity
  • single management network for managing the solution
  • no single point of failure

The compute modules boot from a 3PAR array connected to the Synergy Interconnect modules through a pair of Brocade Fibre Channel switches.

Which components must be part of the solution? (Choose two.)

Options:

A.

four HPE Synergy FC SE 40Gb F8 modules

B.

two HPE Synergy Composes

C.

two Frame Link Modules in each HPE Synergy 12000 Frame

D.

two HPE Synergy Image Streamers

E.

redundant Frame Link Module Front Panel

Question 10

An integrator needs to re-deploy a specific firmware component to one of the Synergy compute nodes.

Click on the option that will allow an integrator to rewrite existing firmware components with the same option.

Options:

Question 11

What must an integrator do before an existing cluster can be imported to the HPE Composer?

Options:

A.

The vCenter Server must be integrated with the HPE Composer

B.

The cluster must be vSAN enabled

C.

The HPE Composer must have at least two management interfaces to connect to the cluster

D.

The cluster must be enabled for HPE Composer integration

Question 12

A customer has forgotten the password for the HPE Composer managing the customer’s HPE Synergy Infrastructure.

Where can the customer reset the password with the assistance of HPE Support?

Options:

A.

FLM Access to Synergy Console

B.

Virtual Center server

C.

Front Access Panel to Synergy Console

D.

Maintenance Console screen

Question 13

How can an integrator increase the efficiency with which a Synergy solution can be provisioned? (Choose two.)

Options:

A.

Use a Multimodule Link Aggregation Group (MLAG) to automate link failover

B.

Use Composer as a PXE server to automate OS deployments

C.

Enable all the compute nodes to boot from SD card in a server profile

D.

Implement Image Streamer to provide a stateless OS environment

E.

Use Powershell to automate configuration and application of server profiles

Question 14

A customer is planning to deploy OneView for vCenter Server to improve management procedures for growing virtualization environment. The customer is concerned about resources required by HPE OneView for vCenter Server.

Which statement about deploying HPE OneView for vCenter Server is true?

Options:

A.

It is deployed as an application on the Windows Server machine with at least 48GB of memory.

B.

It is deployed as a part of the HPE Composer installation.

C.

It is deployed as a virtual machine on the supported hypervisor.

D.

It can only be deployed if HPE Global Dashboard is already installed.

Page: 1 / 4
Total 97 questions