Summer Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

CT-TAE Exam Dumps : Certified Tester Test Automation Engineer

PDF
CT-TAE pdf
 Real Exam Questions and Answer
 Last Update: Apr 24, 2025
 Question and Answers: 80 With Explanation
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$29.75  $84.99
CT-TAE exam
PDF + Testing Engine
CT-TAE PDF + engine
 Both PDF & Practice Software
 Last Update: Apr 24, 2025
 Question and Answers: 80
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$47.25  $134.99
Testing Engine
CT-TAE Engine
 Desktop Based Application
 Last Update: Apr 24, 2025
 Question and Answers: 80
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$35  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

Certified Tester Test Automation Engineer Questions and Answers

Question 1

You are implementing test automation for a project and you want to be able to generate test cases automatically using a series of test design tools which use a variety of test design techniques such as decision tables, pairwise testing and boundary value analysis.

You also want to generate test data automatically which can then be used by the tests.

Initially these tests will be run manually to verify their correctness and ultimately you want to include them in the test execution tool so that they can run unattended.

Which layer of the gTAA will be used to support the specification of the test cases and preparation of the test data?

Options:

A.

The generation layer

B.

The definition layer

C.

The execution layer

D.

The adaptation layer

Buy Now
Question 2

You have inherited a TAS that is working well it uses keyword-driven scripting and was well architected. The automation architect who built the system has now moved on to another company. The TAS is working across several projects and has a multiple library of keywords, categorised by project. The individual project teams maintain these keyword scripts.

Based only on the given information, what is the MOST significant risk for the TAS?

Options:

A.

The keyword driven scripts may become out of date if not maintained

B.

The level of abstraction, coupled with the departure of the architect may make the system hard to maintain

C.

New projects may not work as well with the TAS as the current projects

D.

Because the keyword scripts are maintained by different teams, there is a likelihood that good coding standards are not followed

Question 3

A project consists of distributed teams working in a 24-hour environment, where activities happen at all hours of the day. This project adopts a CI (Continuous Integration) process when developer check-in code and consists of automated activities that include generating a build and deploying it to a test environment. Automated integration tests are run multiple times a day. The project have asked for a report containing the automation test results for every build, which must be available 24/7 to the project team.

Which of the following would be the BEST way to automatically provides this report?

Options:

A.

Store the execution results of the integration tests for the last build to a database (without overwriting the results from the previous builds), use this database to automatically update a dashboard containing the build history and test results accessible to the project team.

B.

Store the execution result of the integration tests for the last build to a database (overwriting the results from the previous build), automatically create a test execution report for this build send It via e-mail to the project team

C.

Store the execution results of the integration tests for the last build to a database (without overwriting the results from the previous builds). Automatically create a test execution report for this build and send it via e-mail to the project team

D.

Store the code coverage results of the integration tests for the last build to a database (without overwriting the results from the previous builds). And automatically create a chart showing the trend in code coverage and send via email to the project team.