Special Summer Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

CT-TAE Exam Dumps : Certified Tester Test Automation Engineer

PDF
CT-TAE pdf
 Real Exam Questions and Answer
 Last Update: Apr 4, 2025
 Question and Answers: 80 With Explanation
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
CT-TAE exam
PDF + Testing Engine
CT-TAE PDF + engine
 Both PDF & Practice Software
 Last Update: Apr 4, 2025
 Question and Answers: 80
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
CT-TAE Engine
 Desktop Based Application
 Last Update: Apr 4, 2025
 Question and Answers: 80
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

Certified Tester Test Automation Engineer Questions and Answers

Question 1

When if the BEST time for automation to consider legal and/or standard requirements for a SUT?

Options:

A.

When implementing the SUT

B.

When designing a TAF

C.

When designing a TAA

D.

When developing a TAS

Buy Now
Question 2

Which of the following is considered a disadvantage of test automation?

Options:

A.

Automated exploratory testing is difficult to implement

B.

Test automation can be a distraction from the objective of finding bugs

C.

Tests are more likely to have operator errors.

D.

Slower feedback on the quality of the system.

Question 3

Which of the following statements BEST describe aspects of the SUT to consider when designing a TAA?

Options:

A.

All the interaction between SUT and TAS should be logged with the highest level of detail

B.

All the internal test interfaces of the SUT should be removed prior to the product release

C.

All the interface of the SUT affected by the tests should be controllable by the TAA

D.

All the external test interfaces of the SUT should be removed prior to the product release