Weekend Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Note! Following C_TSCM42_67 Exam is Retired now. Please select the alternative replacement for your Exam Certification. The new exam code is C_TSCM52_67
Last Week Results
32 Customers Passed SAP
C_TSCM42_67 Exam
Average Score In Real Exam
86.7%
Questions came word for word from this dump
88.6%
SAP Bundle Exams
SAP Bundle Exams
 Duration: 3 to 12 Months
 20 Certifications
  524 Exams
 SAP Updated Exams
 Most authenticate information
 Prepare within Days
 Time-Saving Study Content
 90 to 365 days Free Update
$249.6*
Free C_TSCM42_67 Exam Dumps

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 Questions and Answers

Question 1

An enterprise based in the US produces an end product that is used with the unit of measure "pound" (LB). The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit "kilogram" (KG).

What is the easiest way to fulfill this requirement?

Options:

A.

Define a unit of measure group that converts pounds to kilograms in the basic data customizing and assign it to the material master on basic data view 1.

B.

Add a conversion factor for converting pounds to kilograms on basic data view 1 in the material master.

C.

Create a new material with a reference to the original material and assign the metric unit of measure to the new material master.

D.

There is no need to take any action. In this scenario, the conversion of units of measurements is done automatically.

Buy Now
Question 2

You have maintained planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a material. For the coming months, you have planned requirements with requirement type LSF (derived from main strategy 10). Now, you want to change the requirement type from LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for requirements in the existing production plan.

Which of the following scenarios are applicable in this case? (Choose two)

Options:

A.

You can enter the strategy group 40 in the material master, but the requirement type is not changed automatically for existing requirements.

B.

You must change the requirement type for planning strategy 10 to VSF in Customizing. The requirement type for all existing requirements is then changed by the next planning run.

C.

You can change the strategy group from 10 to 40 for the existing production plan in the material master, and the requirement type for all requirements is changed automatically.

D.

You can enter the strategy group 40 in the material master and change the present requirement for the product manually in the production plan.

Question 3

What do you have to consider regarding ATP checks in SAP ECC that are triggered from customer orders?

Options:

A.

If the ATP check determines non-availability, it then checks in the next step whether timely procurement or production is possible.

B.

The ATP quantity is the available quantity that can be used to confirm incoming customer orders.

C.

An ATP check creates fixed links between customer orders and their confirmed receipts.

D.

The ATP check does not take stocks and receipts into account. It checks consumption of planned independent requirements.