SAP C_TSCM42_67 Exam With Confidence Using Practice Dumps

Exam Code:
C_TSCM42_67
Exam Name:
SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7
Certification:
Vendor:
Questions:
106
Last Updated:
Mar 9, 2025
Exam Status:
Stable
SAP C_TSCM42_67

C_TSCM42_67: SAP Other Certification Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the SAP C_TSCM42_67 (SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7) exam? Download the most recent SAP C_TSCM42_67 braindumps with answers that are 100% real. After downloading the SAP C_TSCM42_67 exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the SAP C_TSCM42_67 exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the SAP C_TSCM42_67 exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA C_TSCM42_67 test is available at CertsTopics. Before purchasing it, you can also see the SAP C_TSCM42_67 practice exam demo.

SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 Questions and Answers

Question 1

Where can you define the valid receivers for production order costs?

Options:

A.

In the costing variant

B.

In the settlement profile

C.

In the valuation variant

D.

In the production scheduling profile

Buy Now
Question 2

In what sequence are the steps of material requirements planning performed in SAP ECC?

Options:

A.

1. Net requirements calculation

2. Lot sizing

3. Determination of the procurement type

4. Scheduling

B.

1. Calculation of safety stock

2. Lot sizing

3. Scheduling

4. Determination of the procurement type

C.

1. Availability check

2. Lot sizing

3. Determination of the procurement type

4. Scheduling

D.

1. Net requirements calculation

2. Lot sizing

3. Scheduling

4. Determination of the procurement type

Question 3

When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.

Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?

Options:

A.

Total planning online

B.

Multi-level single-item planning with the "display material list" option

C.

Interactive single-item planning for the delayed assembly

D.

Multi-level single-item planning with the "simulation mode" option