When the single cell voltage in the battery pack reaches (), it means that the battery pack is already in a risky state

Options:

A.

1.67V

B.

2.25V

C.

2.35V

D.

2.42V

Question 54

What method does the FusionModule800 power input support? (

Options:

A.

One-way

B.

Single or Dual

C.

Two-way

Question 55

When the NetEco management system is sold in the market, which of the following situations does not need to submit RM to the management system RAT for decision-making? ().

Options:

A.

When there are three-party equipment access requirements in the project.

B.

When there is non-standard function customization in the project, the existing products cannot meet it.

C.

When supporting FusionModule products for sale

D.

When large-scale DC project network management is sold

separately.

Question 56

At which of the following voltages the lead-acid battery is already in a dangerous state ()

Options:

A.

1.67

B.

2.25

C.

2.35

D.

2.45