Configure the UPS system scheme, which of the following factors need to be considered in the calculation scheme ( )
The type of humidifier adopted by the row-level chilled water intelligent temperature control product NetCol5000-C032H is ()
Regarding the monitoring software NetEco1000U, the following statements are correct ()
A project requires the management system to access a third-party generator set, two smart meters 1 (same model), and two precision air conditioners (same model), then the management
system needs to report () a third-party equipment access fee ? (