New Year Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

H19-371_V1.0 Exam Questions Tutorials

Page: 24 / 24
Total 653 questions

HCS-Pre-sales-Digital Power V1.0 Questions and Answers

Question 93

Configure the UPS system scheme, which of the following factors need to be considered in the calculation scheme ( )

Options:

A.

UPS type, capacity and parallel mode

B.

The brand and capacity of the battery

C.

Make and model of AC and DC cables

D.

Configuration of battery rack and battery switch box

Question 94

The type of humidifier adopted by the row-level chilled water intelligent temperature control product NetCol5000-C032H is ()

Options:

A.

Electrodes

B.

Super Divine Wave

C.

Infrared

D.

Wet film

Question 95

Regarding the monitoring software NetEco1000U, the following statements are correct ()

Options:

A.

Monitor the working status of the UPS in real time and operate the UPS

B.

Support USB, SNMP, MODUBUS network communication

C.

Email alarm, SMS alarm and other alarm reporting functions

D.

SMS alarm needs to be equipped with SMS cat

E.

Provided for free, download and use the answer from the Huawei Support website

as needed

Question 96

A project requires the management system to access a third-party generator set, two smart meters 1 (same model), and two precision air conditioners (same model), then the management

system needs to report () a third-party equipment access fee ? (

Options:

A.

1

B.

3

C.

5

D.

None of the above is true

Page: 24 / 24
Total 653 questions