Pre-Summer Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

Free Access Cisco 300-610 New Release

Page: 4 / 19
Total 258 questions

Designing Cisco Data Center Infrastructure (DCID) Questions and Answers

Question 13

Refer to the exhibit.

A Cisco engineer is configuring a next-generation Cisco HyperFlex HX data platform with 2 x Cisco UCS 6248UP fabric interconnects. 8 x Cisco HX-Series HX240c-M4SX servers, plus 8 x Cisco UCS B200-M4 blade servers Cisco UCS 5108 blade chassis, and Cisco UCS 2204XP fabric extenders The solution is configured with HX Release 4 5(2a) using VMware ESXi 7 0 U2 After the engineer migrates all customer VMs to the new solution platform, the engineer decides to create HX Native snapshots for all the VMs The engineer performs the operation and notices that some of the VMs are not creating snapshots. What is the most probable reason that the HX Native snapshots are not created?

Options:

A.

Virtual machines are in suspended state

B.

The servers have duplicate names

C.

The source disk is thick provisioned

D.

The node has insufficient datastore space

Question 14

An engineer is designing a data center that uses FCIP. How is QoS configured in this environment?

Options:

A.

A separate DSCP value and CoPP must be configured for all FCIP traffic and another for all of the FCIP in the data connection.

B.

A separate DSCP value must be configured for all FCIP VSAN traffic.

C.

A separate DSCP value and priority queuing must be configured for all FCIP traffic.

D.

Two separate DSCP values must be configured, one of all of the FCIP frames in the control TCP connection and another for all of the FCIP frames in the data connection.

Question 15

Drag the requirements from the left onto the correct policy types on the right.

Options:

Question 16

A company data center requires a new disaster recovery solution to host critical services. The solution can sustain several hours of data loss because the services are routinely backed up to an offsite location. Also, the disaster recovery solution must provide 24-hour availability. Due to the strict policy requirements, the company wants to retain complete control of when the failover process occurs. Which solution meets these requirements?

Options:

A.

active/active

B.

hot standby

C.

warm standby

D.

cold standby

Page: 4 / 19
Total 258 questions