What other details should be included in the following incident report when it is first submitted?
Date of Issue: 23/11/05
Severity: P1
Build: Version15.6
Details: Expected field to be limited to 15 chars, able to enter 27
System testing is:
Your task is to compile a test execution schedule for the current release of software.
The system specification states the following logical dependencies:
• An admin user must create/amend/delete a standard user.
• A standard user is necessary to perform all other actions.
The test plan requires that re-tests must be performed first, followed by the highest priority tests. To save time, the test plan states that tests should be scheduled to create test data for the subsequent tests in the schedule.
The following test cases have been designed, with an indication of priority (1 being the highest priority) and whether the test has previously failed.
Which test execution schedule meets the test plan requirements and logical dependencies?
Which of the following does NOT represent one of the three triggers for maintenance testing an operational system?