A project team plans to seal the HVAC ducts in order to protect them from possible air contamination. In which of the following building phases is this measure most likely to be adopted?
A project's interior designer is designing a room that will act as a restorative space for future employees to break from work and relax. The space will be at least 75 ft2 (7 m2) plus 1 ft2 (0.1 m2) per regular occupant. It will also include features like dimmable lighting, sound masking and calming colors. What additional element(s) should the interior designer incorporate to contribute towards meeting the requirements of the respective WELL optimization?
Which type of artificial light can improve people's perception of a space?