Big Black Friday Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

WELL-AP Exam Dumps : WELL Accredited Professional (WELL AP) Exam

PDF
WELL-AP pdf
 Real Exam Questions and Answer
 Last Update: Nov 22, 2025
 Question and Answers: 204 With Explanation
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
WELL-AP exam
PDF + Testing Engine
WELL-AP PDF + engine
 Both PDF & Practice Software
 Last Update: Nov 22, 2025
 Question and Answers: 204
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
WELL-AP Engine
 Desktop Based Application
 Last Update: Nov 22, 2025
 Question and Answers: 204
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

WELL Accredited Professional (WELL AP) Exam Questions and Answers

Question 1

A design for a WELL building has a dry-bulb temperature and relative humidity monitoring system. To achieve Feature T06: Thermal Comfort Monitoring the project team must confirm that

Options:

A.

sensor readings are taken at least three times per hour

B.

sensors are installed for every 2,500 ft2 (232 m2) of occupiable floor area

C.

sensors are located in occupiable areas 3.6 to 5.6 ft. (1.1 to 1.7 m) above the floor

D.

sensors are placed at least 5 ft. (1.5 m) away from any significant source of heat or cold

Buy Now
Question 2

During a project review meeting, a member of the facility management team states that asbestos containing materials (ACMs) may be present within the project boundary. What strategy should the project team follow to evaluate this issue?

Options:

A.

Notify any building occupants about the risk of ACMs

B.

Create an asbestos action plan to remediate the ACMs and schedule ongoing inspections

C.

Obtain a letter from the building owner affirming there are no known ACMs in the project boundary

D.

Hire a qualified inspector to investigate the project boundary and space to determine whether ACMs are present

Question 3

Which of the following hazardous materials have been restricted for use in paints in many countries?

Options:

A.

Volatile organic compounds (VOCs) and lead

B.

Cadmium and polychlorinated biphenyls (PCB)

C.

Orthophthalates and per- and polyfluoroalkyl substances (PFASs)

D.

Halogenated flame retardants (HFRs) and perfluorinated alkyl compounds (PFCs)