Special Summer Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

TM12 Exam Dumps : ISTQB-BCS Certified Tester Advanced Level- Test Manager (2012)

PDF
TM12 pdf
 Real Exam Questions and Answer
 Last Update: Apr 2, 2025
 Question and Answers: 64
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
TM12 exam
PDF + Testing Engine
TM12 PDF + engine
 Both PDF & Practice Software
 Last Update: Apr 2, 2025
 Question and Answers: 64
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
TM12 Engine
 Desktop Based Application
 Last Update: Apr 2, 2025
 Question and Answers: 64
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

ISTQB-BCS Certified Tester Advanced Level- Test Manager (2012) Questions and Answers

Question 1

You are following a risk-based testing strategy. The test execution time is very limited. Assume that all the product risk items require moreor less the same level of test effort.

Which of the following answers describes the best execution schedule in this scenario?

Number of correct responses: 1

K33 credits

Options:

A.

1- Test the acceptance of transactions coming from the IVR channel

2- Test the correct charge of the Smart Card with the required contents

3- Test the correct pre-activation of the Smart Card

4- Test the correct activation of the Smart Card

B.

1- Test the correct pre-activation of the Smart Card

2- Test the correct charge of the Smart Card with the required contents

3- Test the correct activation of the Smart Card

4- Test the acceptance of transactions coming from the IVR channel

C.

1- Test the correct activation of the Smart Card

2- Test the correct pre-activation of the Smart Card

3- Test the correct charge of the Smart Card with the required contents

4- Test the acceptance of transactions coming from the IVR channel

D.

1- Test the correct pre-activation of the Smart Card

2- Test the correct activation of the Smart Card

3- Test the correct charge of the Smart Card with the required contents

4- Test the acceptance of transactions coming from the IVR channel

Buy Now
Question 2

During the follow-upphase the following conditions are checked:

X1. The code has been completely reviewed

X2. All the identified defects have been correctly fixed and the modified code has been compiled successfully and run through all the static analyzers used by the project without warnings and errors

X3. The modified code is available under the configuration management system with a new version number for the specified CI

If these conditions are fulfilled then the review process terminates.

Which of the following characteristics of a formal review is missing in this description?

Number of correct responses: 1

K21 credit

Options:

A.

Defined entry and exit criteria

B.

Checklists to be used by the reviewers

C.

Deliverables such as reports, evaluation sheets or other review summary sheets

D.

Metrics for reporting on the review effectiveness, efficiency, and progress

Question 3

Improving the Testing Process

Which of the following statements about the STEP test process improvement model is true?

Number of correctresponses: 1

K21 credit

Options:

A.

In the STEP model, tests validate the requirements and use cases when they are developed

B.

The STEP model stresses defect detection and demonstration of capability, whereas the defect prevention is a secondary potential goalof testing

C.

The STEP model assures that the system requirements specification and the test design specification processes don't overlap

D.

In the STEP model, testware design occurs after coding