Weekend Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

TAE Exam Dumps : ISTQB Certified Tester Advanced Level-Test Automation Engineering

PDF
TAE pdf
 Real Exam Questions and Answer
 Last Update: Oct 19, 2025
 Question and Answers: 40
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
TAE exam
PDF + Testing Engine
TAE PDF + engine
 Both PDF & Practice Software
 Last Update: Oct 19, 2025
 Question and Answers: 40
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
TAE Engine
 Desktop Based Application
 Last Update: Oct 19, 2025
 Question and Answers: 40
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

ISTQB Certified Tester Advanced Level-Test Automation Engineering Questions and Answers

Question 1

Which of the following success factors for a test automation project is TRUE?

Options:

A.

Automated tests must be designed to capture only the datathat is strictly needed for comparing expected and actual results

B.

The test cases to be automated first must always be selected based on the number of times a test will need to be run

C.

The test cases to be automated must have a high dependency on particular data values

D.

Automated tests that fail due to changes in the requirements of the SUT should be promptly fixed rather than disabled from the test suite

Buy Now
Question 2

A regression test suite consist of 500 test cases which are allexecuted manually. The business case for a pilot project is based on the adoption of test automation using a commercial tool that will reduce the execution time by a factor of 90% for 100% of the tests in the regression test suite. The pilot project lastedone month ( as planned) and you are currently its results. At the end of the pilot project, 40% of the regression tests have been automated and their execution time has been reduce by 60%.

Which of the following statements is TRUE in this scenario?

Options:

A.

Theduration of the pilot project was too short –it should last unit the success factors are achieved

B.

The target defined for the business case is too accurate –it should not be measureable

C.

The project selected for the pilot is too critical –if should not be too critical or too trivial

D.

The target defined for the business case seems difficult to hit – it should be realistic

Question 3

A SUT has an existing automated test suite.

Which of the following statements relating to the introduction of new features in the SUT is TRUE?

Options:

A.

Automated tests are not affected by the introduction of a new feature and running them against the new SUT is a waste of effort

B.

The introduction of a new feature could require updates or additions to the testware components

C.

The test automation engineer should work with the business analysts to ensure the new feature is testable

D.

It is generally more difficult to automate test cases for a new feature as the developmenthas not yet started