New Year Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

RCDD-002 Exam Dumps : BICSI Registered Communications Distribution Designer - RCDD

PDF
RCDD-002 pdf
 Real Exam Questions and Answer
 Last Update: Jan 9, 2026
 Question and Answers: 361
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
RCDD-002 exam
PDF + Testing Engine
RCDD-002 PDF + engine
 Both PDF & Practice Software
 Last Update: Jan 9, 2026
 Question and Answers: 361
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
RCDD-002 Engine
 Desktop Based Application
 Last Update: Jan 9, 2026
 Question and Answers: 361
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

BICSI Registered Communications Distribution Designer - RCDD Questions and Answers

Question 1

What is the horizontal separation, in well tamped earth, required between power and direct buried telecommunications facilities sharing the same trench?

Options:

A.

152 mm (6 in)

B.

229 mm (9 in)

C.

300 mm (12 in)

D.

381 mm (15 in)

E.

457 mm (18 in)

Buy Now
Question 2

What is the PERT estimate (in hours) for project design where:

- Optimistic time is 40 hours

- Most likely time is 50 hours

- Pessimistic time is 60 hours

Options:

A.

40 hours

B.

45 hours

C.

50 hours

D.

55 hours

E.

60 hours

Question 3

You are designing a nurse call system for a health care facility. The system will have emergency call switches. What is the first step you should take in designing the nurse call system?

Options:

A.

Properly size the supporting TR to accommodate the headend system

B.

Program the headend device for the various call switches that will be used

C.

Perform a risk assessment to determine call switch locations

D.

Perform a site survey to verify the pathways that will connect the headend device with the call switches