Pre-Summer Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

Note! Following H31-341 Exam is Retired now. Please select the alternative replacement for your Exam Certification. The new exam code is H31-341_V2.5

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

HCIP-Transmission V2.0 Questions and Answers

Question 1

Dispersion compensation is not required for 40 Gbit/s and 100 Gbit/s coherent systems because the dispersion tolerance of coherent boards is large. NG WDM products do not support hybrid transmission of non-coherent and coherent networks.

Options:

A.

True

B.

False

Buy Now
Question 2

Loopback is a common operation for routine maintenance and troubleshooting. Which of the following statements about loopback operations are incorrect?

Options:

A.

The hardware loopback is performed by using the fiber jumper or self-loop cable to perform the loopback on the optical port or electrical port.

B.

When performing a hardware loopback on an optical port, you need to add an optical attenuator.

C.

After the outloop is performed, the signals are transmitted to the internal.

D.

After the inloop is performed, the signals are transmitted to the external.

Question 3

In the scenario where the non-convergence OTU processes OTN standard signals, both A and B are WDM sites. After receiving the OTUk_TIM alarm on the client side, the OTU board at station A sends the OTUk_BDI alarm to the upstream. When the TIM follow-up action is disabled, the alarm is no longer transmitted to the downstream. When the TIM follow-up action is enabled, an SF event is generated. The WDM side of the OTU board at station B reports the ODUk_PM_AIS alarm, and the ODUk_PM_AIS alarm is transmitted downstream. The client equipment reports this alarm. After the WDM side of the OTU board at station B receives the OTUk_TIM alarm and the TIM follow-up action is disabled, the alarm is no longer transmitted to the downstream. When the TIM follow-up action is enabled, an SF event is generated. After the client side of station B processes the SF event, the client equipment reports the ODUk_PM_AIS alarm.

Options:

A.

True

B.

False