Special Summer Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Note! Following H13-629_V2.0 Exam is Retired now. Please select the alternative replacement for your Exam Certification. The new exam code is H13-629_V2.5

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

HCIE-Storage (Written) v2.0 Questions and Answers

Question 1

True or False, The smart Matrix architecture is a multi-control interconnected system architecture designed by Huawei for the core storage system of an enterprise data center. Based on the smart matrix principle, Huawei OceanStor 18000 supports up to 16 engines (32 controllers) cluster.

Options:

A.

True

B.

False

Buy Now
Question 2

True or False, the SESparse virtual disk is a virtual disk format that reclaims space after the virtual machine's operating system has expired data or deleted data.

Options:

A.

True

B.

False

Question 3

An Engineer installed a OceanStor 9000 for a customer (a total of 5 OceanStor 9000 C Node, front and rear endsare 10GE TOE networking, on-site installation TOE network card). Then connected the signal lines, power lines, and debugged the software. During the installation there were issues. Which of the following description of these issues are correct? (Multiplechoice.)

Options:

A.

5 devices TOE NIC A0, B1, and A0, B3 inserted into the PCIe slot will not affect the system. Deployment will not affect the network bandwidth, so it cannot be adjusted.

B.

The signal cables are long and need to be strapped to the cabinet or placed on the bottom tray.

C.

Label NODE 01 A0-0 The signal cable is inserted in the network port A0-1. The signal cable labeled NODE01 B3-1 is inserted in the network position B3-0, due to the same network card two network port peer, you can place the wrongline, you cannot adjust.

D.

CE6850 switch connected to two stacked copper cables, one of which is needed to post-cold more cold, because it does not affect the network interoperability. You can base this software debugging.