EMC Related Exams
E20-575 Exam
A database team is performing tests against a PIT copy data. Their write activity is going to exceed the currently allocated amount of space dedicated to Image Access mode. What should be done to allow testing to continue without disruption to their testing?
A storage administrator has one production site and one remote site. The administrator configured the RecoverPoint with VNX (SE) cluster at both sites. The current environment has two Consistency Groups configured with two copies each; one production copy and one remote copy. Based on the company’s growing business requirements, the administrator has been asked to keep a local copy of the production data.
Which action should occur in order to meet this requirement?
What is the result of configuring the I/O throttling level to “low”?