Summer Certification Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

E20-375 Exam Dumps : RecoverPoint Specialist Exam for Implementation Engineers

PDF
E20-375 pdf
 Real Exam Questions and Answer
 Last Update: Aug 5, 2026
 Question and Answers: 200
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
E20-375 exam
PDF + Testing Engine
E20-375 PDF + engine
 Both PDF & Practice Software
 Last Update: Aug 5, 2026
 Question and Answers: 200
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
E20-375 Engine
 Desktop Based Application
 Last Update: Aug 5, 2026
 Question and Answers: 200
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

RecoverPoint Specialist Exam for Implementation Engineers Questions and Answers

Question 1

You have configured replication using a local and remote copy. After a data corruption event, you decide to restore production from a point-in-time image of the local copy.

What must be considered before restoring the volume?

Options:

A.

Remote replication is paused during the restore

B.

Journal history at both sites will be lost

C.

Consistency Group will be disabled

D.

Production journal must be restored

Buy Now
Question 2

An administrator experiences a serious error with an RPA and calls EMC Support to resolve the issue. They are concerned that the system did not automatically notify EMC Support via the ESRS gateway. You check all settings in Unisphere Configure System Notification and find they are correct.

What is the most likely cause for this notification failure?

Options:

A.

TCP port 25 blocked at their firewall

B.

TCP port 989 blocked at their firewall

C.

TCP port 990 blocked at their firewall

D.

Temporary remote support license key expired

Question 3

A company with a DR site connected with a 2 Gbps FC link has three vRPAs at each site. They are experiencing High Load events, although the FC link is not fully utilized.

What would be the best solution to get the FC link utilization up as high as possible while mitigating those events?

Options:

A.

Replace the vRPAs with physical RPAs and start using a Distributed Consistency Group

B.

Add two more vRPAs to the Primary site and divide the Consistency Group into four segments

C.

Divide the Consistency Group into two segments and start using Distributed Consistency Groups

D.

Add two RPAs to the Primary site as well as the secondary site