EMC Related Exams
DEE-1111 Exam
Refer to the exhibit.

What should be done first to recover from this Concurrent SRDF/Star configuration failure?
What is the composition of PowerMax TDATs?
Alerts are required to track high I/O response times for a specific storage group. I/O Response times greater than 10 ms require next day analysis. I/O response times greater than 15 ms require immediate intervention.
Which alert settings are required?