EMC Related Exams
DEE-1111 Exam

A disaster occurred at the workload site of an SRDF/Star configuration. The administrator decides to move the workload to the Synchronous site (Site B).
What symstar command should be used before the workload switch?
Which two factors define Capacity Management?
Refer to the exhibit.
Which correctly describes a possible configuration created by SYMACL?