EMC Related Exams
DEE-1111 Exam
Alerts are required to track high I/O response times for a specific storage group. I/O Response times greater than 10 ms require next day analysis. I/O response times greater than 15 ms require immediate intervention.
Which alert settings are required?
SRDF/A MSC has been configured between two sites. There are two PowerMax arrays at the source site and two PowerMax arrays at the target site. An SRDF/A MSC trip event has occurred.
What happens if the Receive Delta Set on one of the target arrays is incomplete?
Refer to the exhibit.

What should be done first to recover from this Concurrent SRDF/Star configuration failure?