You can pre-order your ISTQB Certified Tester Foundation Level - Specialist Performance Testing exam to us and we will make it available in 2 Weeks to 3 Weeks maximum. CertsTopics.com Team will Arrange All Real Exam Questions only from Real Exam within next 2 Weeks to 3 Weeks Time only and make them available for you.
In the unlikely event if we can't make this exam available to you then you will issue a full refund! So there is no risk involve at all.
Associate each type of performance test (listed from 1 to 5) with part of a description that allows its characterization and/or identification (listed from A to E).
1.Endurance testing
2.Scalability testing
3.Capacity testing
4.Stress testing
5.Concurrency testing
1.Type of testing focused on the ability of a system to meet future efficiency requirements.
2.Type of testing used to evaluate a system's ability to handle reduced availability of resources.
3.Type of testing focused on the stability of the system over a specific time frame.
4.Type of testing used to determine the number of transactions a given system will support while still meeting established performance objectives.
5.Type of testing focused on the impact of situations where specific actions occur simultaneously.
SELECT ONE OPTION
(REFER TO BASE SCENARIO 2): IV/rerj you refer to Base Scenario 2, you are referring to the description and only the description, without any modification.
Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).
Throughout the month of January (31 days), the company performed 3,100 departure operations from the Capital City Airport. These departure operations transported 465,000 passengers during the hours of operation, from 07:00 to 23:00.
The departing passengers (one of the most relevant operational profiles) will access the front-end of the application to check in for their flight. It is known that 30% of departing passengers reconnect after checking in to request the boarding pass to be resent or printed.
Question
A performance test will be carried out for which 11,700 transactions will be necessary to simulate an operation similar to that described in the base scenario and the restrictions of this question. How many virtual users will be necessary to achieve this number of transactions and the conditions of the operations?
SELECT ONE OPTION
Select the ONE option that describes the mechanism used to extract metrics associated with deadlocks and multi threading problems
SELECT ONE OPTION