Month End Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

CTFL-AuT Exam Dumps : ISTQB Certified Tester Foundation Level - Automotive Software Tester

PDF
CTFL-AuT pdf
 Real Exam Questions and Answer
 Last Update: Apr 26, 2025
 Question and Answers: 40
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
CTFL-AuT exam
PDF + Testing Engine
CTFL-AuT PDF + engine
 Both PDF & Practice Software
 Last Update: Apr 26, 2025
 Question and Answers: 40
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
CTFL-AuT Engine
 Desktop Based Application
 Last Update: Apr 26, 2025
 Question and Answers: 40
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

ISTQB Certified Tester Foundation Level - Automotive Software Tester Questions and Answers

Question 1

Which of the following options describes a relevant aspect of the design of a test environment for software-ln-the-loop (SIL)?

Options:

A.

A wrapper is used as part of the testing with Software-in-the-Loop (SiL)

B.

Software-m-the-Loop (SL) needs an Interface to the real vehicle or prototype.

C.

With Software4rMhe-loop (SI), the tested software is implemented m a real control unit,

D.

For Software-in-the-Loop (SIL). usually no specific hardware is used

Buy Now
Question 2

As a unit tester (.module tester’’) you are working on a project and are supposed to develop a test strategy.

Which of the following test and analysis procedures is. according to Automotive SPIC®NOT an appropriate clamant of a verification strategy for unit tests (software units), which ware "manually coded"?

Note The components to verify are non-safety relevant and safely relevant (up to ASlL-C) components

Options:

A.

Tool supported static analysis

B.

Hardware-in-the-Loop-Tests

C.

Unit tests (Test of Software-Units)

D.

Code-Reviews

Question 3

The following methods table shows a partial functional safety guideline of an OEM (Car Maker):

What do the plus symbols in the table mean for the taster of the supplier?

Options:

A.

The tester of the suppler must choose an appropriate combination of methods and explain Ms choice. The methods with a double plus symbol should be given higher consideration

B.

Single plus symbol means .should be applied by the tester of the suppler", double plus symbol means "can be applied by the tester of the suppler".

C.

A single plus symbol means .must be covered by each tester of the supplier'. double plus symbol means "must be tested for applicability by me tester of the contractor".

D.

Single plus symbol means .must be applied by the tester of the suppler", double plus symbol means 'can be applied by the tester of the supplier