New Year Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

3V0-41.22 Exam Dumps : Advanced Deploy VMware NSX-T Data Center 3.x

PDF
3V0-41.22 pdf
 Real Exam Questions and Answer
 Last Update: Dec 21, 2024
 Question and Answers: 16 With Explanation
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$25.5  $84.99
3V0-41.22 exam
PDF + Testing Engine
3V0-41.22 PDF + engine
 Both PDF & Practice Software
 Last Update: Dec 21, 2024
 Question and Answers: 16
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$40.5  $134.99
Testing Engine
3V0-41.22 Engine
 Desktop Based Application
 Last Update: Dec 21, 2024
 Question and Answers: 16
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$30  $99.99

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

Advanced Deploy VMware NSX-T Data Center 3.x Questions and Answers

Question 1

Task 16

You are working to automate your NSX-T deployment and an automation engineer would like to retrieve your BOP routing information from the API.

You need to:

• Run the GET call in the API using Postman

• Save output to the desktop to a text file called API.txt

Complete the requested task.

Notes: Passwords are contained in the user _ readme.txt. This task is not dependent on another. This task should take approximately 5 minutes to complete.

Options:

Buy Now
Question 2

Task 1

You are asked to prepare a VMware NSX-T Data Center ESXi compute cluster Infrastructure. You will prepare twoESXiservers in a cluster for NSX-T overlay and VLAN use.

All configuration should be done using the NSX UI.

• NOTE: The configuration details in this task may not be presented to you in the order in which you must complete them.

• Configure a new Transport Node profile and add one n-VDS switch. Ensure Uplink1and Uplink 2 of your configuration use vmnic2 and vmnic3 on the host.

Complete the requested task.

NOTE: Passwords are contained in the user_readme.txt. Configuration details may not be provided in the correct sequential order. Steps to complete this task must be completed in the proper order. Other tasks are dependent on the completion Of this task. You may want to move to other tasks/steps while waiting for configuration changes to be applied. This task should take approximately 20 minutes to complete.

Options:

Question 3

Task 15

You have been asked to enable logging so that the global operations team can view inv Realize Log Insight that their Service Level Agreements are being met for all network traffic that is going in and out of the NSX environment. This NSX environment is an Active / Active two Data Center design utilizing N-VDSwith BCP. You need to ensure successful logging for the production NSX-T environment.

You need to:

  • Verify via putty with SSH that the administrator can connect to all NSX-Transport Nodes. You will use the credentials identified in Putty (admin).
  • Verify that there is no current active logging enabled by reviewing that directory is empty -/var/log/syslog-
  • Enable NSX Manager Cluster logging
  • Select multiple configuration choices that could be appropriate success criteria
  • Enable NSX Edge Node logging
  • Validate logs are generated on each selected appliance by reviewing the "/var/log/syslog”

Complete the requested task.

Notes: Passwords are contained in the user _ readme.txt. complete.

These task steps are dependent on one another. This task should take approximately 10 minutes to complete.

Options: