Winter Special - Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: top65certs

170-010 Exam Dumps : Brocade Certified vRouter Engineer

PDF
170-010 pdf
 Real Exam Questions and Answer
 Last Update: Mar 3, 2025
 Question and Answers: 85
 Compatible with all Devices
 Printable Format
 100% Pass Guaranteed
$29.75  $84.99
170-010 exam
PDF + Testing Engine
170-010 PDF + engine
 Both PDF & Practice Software
 Last Update: Mar 3, 2025
 Question and Answers: 85
 Discount Offer
 Download Free Demo
 24/7 Customer Support
$47.25  $134.99
Testing Engine
170-010 Engine
 Desktop Based Application
 Last Update: Mar 3, 2025
 Question and Answers: 85
 Create Multiple Test Sets
 Questions Regularly Updated
  90 Days Free Updates
  Windows and Mac Compatible
$35  $99.99
Last Week Results
32 Customers Passed Brocade
170-010 Exam
Average Score In Real Exam
86.7%
Questions came word for word from this dump
88.6%
Brocade Bundle Exams
Brocade Bundle Exams
 Duration: 3 to 12 Months
 3 Certifications
  4 Exams
 Brocade Updated Exams
 Most authenticate information
 Prepare within Days
 Time-Saving Study Content
 90 to 365 days Free Update
$291.2*
Free 170-010 Exam Dumps

Verified By IT Certified Experts

CertsTopics.com Certified Safe Files

Up-To-Date Exam Study Material

99.5% High Success Pass Rate

100% Accurate Answers

Instant Downloads

Exam Questions And Answers PDF

Try Demo Before You Buy

Certification Exams with Helpful Questions And Answers

Brocade Certified vRouter Engineer Questions and Answers

Question 1

You want to capture all traffic traversing an Ethernet switch on your workstation for protocol monitoring.

What must you do?

Options:

A.

Connect your workstation to a VLAN trunk port on the switch.

B.

Place the card on your workstation into promiscuous mode.

C.

Connect your workstation to an analyzer port on the switch.

D.

Configure the switch to forward all traffic to your switch port.

Buy Now
Question 2

vyatta@vyatta:~$ show dhcp client leases

interface : eth1

last update : Wed Jun 19 00:06:00 GMT 2013

reason : FAIL

vyatta@vyatta:~$

Based on the output shown, which two statements are true? (Choose two.)

Options:

A.

Interface eth1 is configured to acquire an address through DHCP.

B.

Interface eth1 has failed.

C.

Interface eth1 is disconnected.

D.

Interface eth1 does not have an IP address.

Question 3

vyatta@vyatta:~$ show dhcp server leases

IP address Hardware Address Lease expiration Pool Client Name

---------- ---------------- ---------------- ---- -----------

10.224.7.40 00:04:f2:02:84:49 2013/06/22 17:46:20 ClientLAN

10.224.7.41 d4:be:d9:1b:ed:9e 2013/06/22 20:27:26 ClientLAN PC-HR-34

vyatta@vyatta:~$ show dhcp server statistics

pool pool size # leased # avail

---- --------- -------- -------

ClientLAN 11 2 9

vyatta@vyatta:~$

Based on the output shown, which statement is true?

Options:

A.

The address lease interval is 24 hours.

B.

10.224.7.40 is the first address in the pool named Windows.

C.

The pool named ClientLAN has 11 total addresses.

D.

PC-HR-34 is connected directly to the vRouter.