Black Friday Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Nokia 4A0-103 Exam With Confidence Using Practice Dumps

Exam Code:
4A0-103
Exam Name:
Nokia Multi Protocol Label Switching
Certification:
Vendor:
Questions:
249
Last Updated:
Nov 23, 2024
Exam Status:
Stable
Nokia 4A0-103

4A0-103: SRC Certification Exam 2024 Study Guide Pdf and Test Engine

Are you worried about passing the Nokia 4A0-103 (Nokia Multi Protocol Label Switching) exam? Download the most recent Nokia 4A0-103 braindumps with answers that are 100% real. After downloading the Nokia 4A0-103 exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the Nokia 4A0-103 exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the Nokia 4A0-103 exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (Nokia Multi Protocol Label Switching) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA 4A0-103 test is available at CertsTopics. Before purchasing it, you can also see the Nokia 4A0-103 practice exam demo.

Nokia Multi Protocol Label Switching Questions and Answers

Question 1

Click on the exhibit.

Initially, all links along the path R1-R2-R4-R6 have 400Mbps unreserved bandwidth and all links along the path R1-R3-R5-R6 have 800Mbps unreserved bandwidth. Shared Explicit reservation style is used and Make-Before-Break is enabled. Both fully loose LSPs have been signaled as shown. Later, the configured bandwidth for LSP-1 is changed to 400Mbps. Which of the following is TRUE?

Options:

A.

After a new path for LSP-1 is established on R1-R3-R5-R6, the old path is torn down.

B.

After the old path for LSP-1 is torn down, the new path is established on R1-R3-R5-R6.

C.

LSP-1 will stay on R1-R2-R4-R6 because there is enough bandwidth on the existing path.

D.

LSP-1 will be torn down because CSPF fails to find a new path.

Buy Now
Question 2

Click on the exhibit.

Which of the following CANNOT be used to ensure the LSP toR6" will follow the path R1-R2-R4-R6?

Options:

A.

Admin groups

B.

Hop-limit

C.

Strict hops

D.

TE-Metric

Question 3

Click on the exhibit button below.

Given the configuration below, what is the system ID of the destination node?

Options:

A.

10.32.1.2

B.

10.1.478

C.

1048.1.1

D.

Cannot tell from this configuration

E.

10.1.2.2