You need to calculate estimated consumption of ingredients for liquid cleaning solution.
What is the consumption? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
You need to configure production control parameters for liquid cleaning solution manufacturing.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
You need to configure costing for raw materials used to manufacture unscented cleaning solution.
Which form should you use?
You need to resolve the shop supervisor’s issue.
Which options should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
You need to resolve the production manager issue.
How should you configure manufacturing execution? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
A manufacturing company uses advanced warehouse management functionality for a new warehouse.
After releasing a production order, you observe that the warehouse work for raw material picking was not generated.
You need to go through the warehouse management setup to determine what is missing.
What three setup configurations must you validate? Each correct answer presents part of the solution.
NOTE; Each correct selection is worth one point.
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some questions sets might have more than one correct solutions, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 for Finance and Operations for their Lean manufacturing environment.
There has been an engineering change to a fixed quantity product that is in production. This change will add an additional processing step as the second step. The existing version must be phased out and replaced by the new version.
You need to ensure that the engineering change takes affect at the end of the month.
Solution:
1.) Edit the existing step number two activity to be the new engineering process
2.) Edit the existing production flow. Set the expiration date due to the end of the month
3.) Edit the existing Kanban rule. Set the expiration date to the end of the month
4.) Activate the production flow
Does the solution meet the goal?
You are the production scheduler for a manufacturing company. You have run the Resource Group Capacity report as shown in the Resource Group 21 Capacity exhibit. (Click the Resource Group 21 Capacity tab).
After reviewing that report, you run Resource Capacity reports as shown in the Resource 2101 and 2102 Capacity exhibits. (Click the 2101 Capacity and 2102 Capacity tabs.)
You run the Gantt chart report as shown in the Gantt exhibit to determine the production orders scheduled on the resources. (Click the Gantt tab.)
You need to determine the method to schedule the production lines.
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.
A company makes lubricants and greases that are used in the automotive industry.
The items use the standard cost method. Electricity and heating of the manufacturing building are allocated into the cost of goods based on the size and wattage of the machine used.
You need to ensure that the system is set up to support the cost allocation.
How should you complete the costing sheet configuration? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You are the production supervisor at a chemical processing plant. You must track attributes for each batch of
chemicals. Automated quality orders must be generated when a batch order for these chemicals is reported as
finished.
You need to ensure that the values of attributes are updated and tracked.
What three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
A company produces multiple products that require an installation kit that includes 50 components.
The company does not want to include these 50 components in every Bill of materials (BOM). You have a BOM kit that includes all 50 components, but you do not want it to produce a separate production order.
You need to set up the product BOM for the finished good.
What should you do?
You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
You need to configure the bicycles’ production resource.
Which option should you use?
You need to create the production orders for standard model bicycles.
Which method should you use?
You need to determine the sales price for a new limited-edition bicycle for the summer season.
What should you do?
You need to configure the system for plastic operations.
Which two parts should be manually reported as finished? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
You need to set up the configuration model to price the motorcycles correctly. What should you do?
You need to modify the production order defaults for the manufacturing execution production order Start process.
What should you do? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to configure each item for plastic manufacturing.
Which production types should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
You need to set up the metal production route and BOM.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
You need to set up the system to calculate the overhead rates automatically for production.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
You need to configure system attributes.
Which attribute types should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to configure the system to track the cost and delivery performance of VendorZ.
Which two actions should you perform? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
You need to resolve the issue for UserE.
Which configuration options should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to determine the batch values on the combined mix batches for OperatorA.
Which values should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to set up the chocolate items.
Which values should you select? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to resolve the issue for UserB.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
You need to configure the system to meet the requirements.
What should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to resolve the issue for UserF.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to resolve the issue for UserG.
What should you do? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to resolve the issue for UserC.
Which two options should you configure? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
You need to meet the needs for the large teakwood furniture order.
What must you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
You need to enable the features and configuration keys for the firepits.
Which two features should you enable? Each answer presents part of the solution.
NOTE: Each correct selection is worth one point