Microsoft Dynamics 365 Supply Chain Management-Manufacturing Questions and Answers

Question 9

A company makes lubricants and greases that are used in the automotive industry.

The items use the standard cost method. Electricity and heating of the manufacturing building are allocated into the cost of goods based on the size and wattage of the machine used.

You need to ensure that the system is set up to support the cost allocation.

How should you complete the costing sheet configuration? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 10

You are the production supervisor at a chemical processing plant. You must track attributes for each batch of

chemicals. Automated quality orders must be generated when a batch order for these chemicals is reported as

finished.

You need to ensure that the values of attributes are updated and tracked.

What three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Assign the attributes to the chemicals

B.

Assign the attributes to the appropriate test on the test group

C.

Create attribute types

D.

Set up batch attributes

E.

Create a test instrument for each attribute

Question 11

A company produces multiple products that require an installation kit that includes 50 components.

The company does not want to include these 50 components in every Bill of materials (BOM). You have a BOM kit that includes all 50 components, but you do not want it to produce a separate production order.

You need to set up the product BOM for the finished good.

What should you do?

Options:

A.

Select Phantom on the engineering fast tab on the kit item.

B.

Change the coverage group on the kit item to Manual.

C.

Change the line type to Phantom.

D.

Change the line type to Pegged supply.

Question 12

You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.