New Year Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Free and Premium AVIXA CTS Dumps Questions Answers

Page: 1 / 14
Total 193 questions

Certified Technology Specialist Questions and Answers

Question 1

Which connector is TYPICALLY used for RS232 connections?

Options:

A.

B.

C.

D.

Buy Now
Question 2

A 2x2 video wall was sold with each display being Full HD resolution. Now the client wants to show live content at the best possible quality over the complete wall. Which resolution must the camera provide?

Options:

A.

1920 x 1080

B.

3840 x 2160

C.

4096 x 2160

D.

7680 x 4320

Question 3

An event planner for a banquet surrounding a swimming pool has requested that the pool be lit in the client’s colors using underwater lighting. What does the technician need to consider?

Options:

A.

the IP rating of the fixtures

B.

access to a grounded power supply

C.

whether the installing technicians are PADI certified

D.

the ability to physically secure the fixtures underwater

Question 4

Which one of these features has to be disabled for a network switch in a Dante network?

Options:

A.

QoS (Quality of Service)

B.

PoE (Power over Ethernet)

C.

EEE (Energy Efficient Ethernet)

D.

IGMP (Internet Group Management Protocol)

Question 5

Network Quality of Service (QoS) is defined as

Options:

A.

the ability to prioritize the traffic in the network system.

B.

the ability to set the quantity of stations connected via the network.

C.

the ability to remotely manage network switches, routers and hubs via the network connection.

D.

a feature allowing the network administrator to monitor who is connected to the network at any given time.

Question 6

During the needs analysis stage, it is MOST IMPORTANT to determine the client's

Options:

A.

budget.

B.

application.

C.

mission statement.

D.

installation time frame.

Question 7

Which connector is typically used for ease of termination for various signal types?

Options:

A.

B.

Question 8

Before confirming an anticipated completion date with the customer, it is MOST important to

Options:

A.

double check the floor finishes.

B.

ensure the date is not a holiday.

C.

ensure no components are backordered.

D.

create the system maintenance schedule.

Question 9

According to AVIXA Standards, what is the MINIMUM load rating for truss that will hold a 5000 lbs (2268 kg) LED wall?

Options:

A.

15000 lbs (6804 kg)

B.

25000 lbs (11340 kg)

C.

30000 lbs (13608 kg)

D.

50000 lbs (22678 kg)

Question 10

Milestones are key events or deliverables in a project. On a Gantt Chart or Network Diagram, milestones are represented by a(n)

Options:

A.

circle or oval.

B.

diamond or triangle.

C.

square or rectangle.

D.

asterisk or apostrophe.

Question 11

When designing a projection system for an auditorium, what are the PRIMARY design considerations?

Options:

A.

HVAC layout, rear projection, text height

B.

presenter position, viewing area, aspect ratio

C.

viewing cone, viewing distance, viewing angle

D.

inverse square law, screen gain, reverberation

Question 12

Which of the following project management activities coordinates project requirements and resources?

Options:

A.

project budget

B.

logic model timeline

C.

logic network diagram

D.

project kick-off meeting

Question 13

Which viewing category describes the usage of a display as reference for CAD drawings?

Options:

A.

PV (Passive Viewing)

B.

FMV (Full Motion Viewing)

C.

BDM (Basic Decision Making)

D.

ADM (Analytical Decision Making)

Question 14

Remotely monitoring system health of a deployed conference room and rebooting it when faulty is an example of

Options:

A.

a service call.

B.

troubleshooting.

C.

a service contract.

D.

proactive maintenance.

Question 15

Constant voltage distributed audio systems utilize a_____wiring scheme.

Options:

A.

star

B.

loop

C.

series

D.

parallel

Question 16

Which microphone type has a basic cardioid pick up pattern?

Options:

A.

Type(a)

B.

Type(b)

C.

Type(c)

D.

Type(d)

Question 17

During an initial meeting with a prospective client regarding an audiovisual project, it is important to understand the customer's method of procurement in order to avoid.

Options:

A.

making commitments with regard to delivery times for equipment.

B.

designing the system beyond the budgetary constraints of the client.

C.

missing some of the important components that will be included in the final project.

D.

expending time and resources designing a project that may ultimately go to bid (tender).

Question 18

A client requests for a project to be completed earlier than initially scheduled. What should the AV contractor do FIRST to address this change?

Options:

A.

deny the request and work to the original agreed schedule

B.

allocate more resources to meet the earlier completion date

C.

provide a request for change (RFC) to the client to approve the change to the schedule

D.

provide a change order (CO) to the client outlining changes to the project and any additional costs

Question 19

During a routine service visit, an engineer notices an LED indicator on a projector's front panel blinking regularly. What should be done?

Options:

A.

consult the projector's manual

B.

replace the projector's lamp and filters

C.

disregard because the projector is operational

D.

remove the power cable and re-boot the projector

Question 20

Upon completion of hardware installation and configuration for a new deployment, the NEXT thing the AV Project Manager should have scheduled is

Options:

A.

training the client.

B.

testing and verification.

C.

invoicing and project close out.

D.

preventative maintenance schedule.

Question 21

What is the document that shows project tasks, indicating their allocated time, dependencies, and relationships between activities?

Options:

A.

flow chart

B.

Gantt chart

C.

needs analysis

D.

Venn diagram

Question 22

A client has ordered a large project from a company. This project has several critical components and a fixed schedule. Which of the following will be VITAL for ensuring that the company meets the deadlines?

Options:

A.

proper job costing

B.

confirming lead times

C.

qualifying the customer

D.

confirming price changes

Question 23

"Shock Loads" for equipment mounts refer to

Options:

A.

suspended equipment not electrically isolated from Its mounting structure.

B.

sudden additional loads from earthquakes or personnel hanging from the mounts.

C.

calculated counterweight required to balance an offset load on a cantilever mount.

D.

calculated isolation required to eliminate vibration otherwise transferred to the building structure.

Question 24

Which of the following is the BEST service when new firmware is available for installed equipment across a fleet of conference rooms?

Options:

A.

keeping current version

B.

replacing the equipment

C.

updating them all at once

D.

a ringed update approach

Question 25

A remote monitoring system's PRIMARY benefit is that it

Options:

A.

reduces the need for service calls.

B.

does not need to be located in the same building.

C.

provides a faster response time for problem solving.

D.

allows the AV team to make sure the equipment is being used properly.

Question 26

The MAIN benefit of an inventory tracking system in an AV rental and staging business is having an accurate record of

Options:

A.

customers contact details.

B.

current resale value of assets.

C.

current state and commitments of assets.

D.

customer’s budgets and spending history.

Question 27

One way to safeguard individual pieces of equipment in a rack from theft is the use of

Options:

A.

lacing bars.

B.

a rack shelf.

C.

security screws.

D.

a password.

Question 28

In order to calculate throw distances for an existing installation, what is the FIRST thing to evaluate?

Options:

A.

aspect ratio

B.

light conditions

C.

the size of the screen

D.

the height of the ceiling

Question 29

Which document is used to clarify a project design issue?

Options:

A.

change order

B.

progress report

C.

request for change

D.

request for Information

Question 30

Which section of a program report describes the probable costs of an AV project?

Options:

A.

budget

B.

needs analysis

C.

systems descriptions

D.

infrastructure requirements

Question 31

Project documentation states the system must logically Isolate control and media networks. What piece of network equipment should be used?

Options:

A.

router

B.

access point

C.

managed switch

D.

unmanaged switch

Question 32

What is the MAIN difference between OLED displays and LED displays?

Options:

A.

luminosity

B.

higher brightness

C.

self-emitting light source

D.

determined screen shape

Question 33

What PRIMARY concern should the sales representative have had during the site survey of this room?

Options:

A.

room orientation

B.

length of cable runs

C.

ceiling clearance for the projector lift

D.

combination of fluorescent and Incandescent lighting

Question 34

Assuming that the speakers in the picture on the LEFT are 8 Q drivers, what is the impedance of the speaker system on the left?

Options:

A.

2Q

B.

4Q

C.

8Q

D.

16 Q

Question 35

The FIRST step in troubleshooting an AV system is to

Options:

A.

clearly identify the failure symptoms.

B.

change only one component at a time.

C.

ensure that all the system components have power.

D.

divide the system in half to identify the portion that is not working.

Question 36

When doing a site survey, it is MOST IMPORTANT to consider the client's

Options:

A.

budget.

B.

timeline.

C.

expectations.

D.

knowledge of technology.

Question 37

A client wants to upgrade tire AV system in a boardroom and add control of the lights and shades to the control panel. What information is MOST relevant to gather to enable this integration?

Options:

A.

color temperature

B.

number of IR ports

C.

warranty Information

D.

communications protocols

Question 38

When connecting two switches with multiple VLANs, which function should be setup in order to pass all the packets from one switch to the other?

Options:

A.

trunk line

B.

multicast routing

C.

QoS (Quality of Service)

D.

SFP (Small Form-factorPluggable)

Question 39

Which of the following is an example of PPE?

Options:

A.

fiberglass ladder

B.

high visibility vest

C.

virtual reality headset

D.

company branded polo

Question 40

When specifying a paging system for a large building, what kind of speaker system should be recommended?

Options:

A.

near field

B.

line array

C.

direct coupled

D.

constant voltage

Question 41

In which of the following scenarios would infrared (IR) wireless microphones be preferred?

Options:

A.

large auditoriums

B.

rooms with direct sunlight

C.

spaces where security is an issue

D.

conferences with high frequency fluorescent lights

Question 42

When planning video content with a client, it is important to get their Pantone data (PMS) to ensure

Options:

A.

the displayed colors match printed colors.

B.

their confidence monitor size is large enough.

C.

the displayed logo is the proper size and style.

D.

the displayed type face is the correct size and style.

Question 43

The architect states that the project is in the pre-design phase. This would indicate that

Options:

A.

construction is about to commence.

B.

a needs analysis should be requested.

C.

the reflected ceiling plan has been approved.

D.

the control system is ready for implementation.

Question 44

What is the PRIMARY advantage of preventive maintenance?

Options:

A.

upfront costs

B.

system fail proof

C.

less equipment downtime

D.

better system performance

Question 45

What is a common vulnerability in a networked AV System?

Options:

A.

open ports

B.

using IPv6

C.

static IP address

D.

strong passwords

Question 46

Which section of the Ohm's Law chart should be used to calculate values expressed in Ohms? Select the answer by clicking anywhere within the correct quadrant.

Options:

Question 47

In order to mount a projector so that it is horizontally centered with the suspended screen, the technician should look at which drawings in the plans?

Options:

A.

detail

B.

sections

C.

elevations

D.

reflected ceiling

Question 48

The integrator gets an urgent service call from the client's AV engineer that there is no power indication on the HDMI switcher in the rack. What is the BEST workaround that the integrator can suggest?

Options:

A.

call the manufacturer for support

B.

change the power supply of the faulty unit

C.

bring in another switcher to replace the broken one

D.

patch the Input to the output, bypassing the switcher

Question 49

A schedule is being created for a project. Which of these factors will have the MOST impact on the calculations?

Options:

A.

labor hours

B.

inventory

C.

blueprints

D.

cost of materials

Question 50

During a site survey of a facility to be upgraded or modernized, it is important to check wireless microphones that may be redeployed to ensure

Options:

A.

battery types conform to environmental concerns.

B.

polar patterns will not clash with new fabric treatments.

C.

microphones are operating on acceptable radio frequencies.

D.

antenna design will not interfere with HDBaseT signal distribution system.

Question 51

After installation, the system does not pass audio. Based on the information in the drawing, what is the MOST LIKELY cause?

Options:

A.

cable lengths

B.

system needs a DSP

C.

phantom power is required

D.

speaker requires a 70 V transformer

Question 52

What is a MAIN benefit of an externally managed AV/IT service?

Options:

A.

reduce costs for business-software

B.

complete outsourcing of the AV/IT department

C.

on-demand availability of computer system resources

D.

cost reduction in operations through clear responsibilities

Question 53

While conducting routine maintenance, an AV technician notices that there is distortion coming from the main loudspeaker. This is likely caused because the amplifier's

Options:

A.

volume is minimized.

B.

volume is maximized.

C.

input signal is clipping.

D.

input signal is showing a bouncing audio signal.

Question 54

Which of the following translates the IP address of a computer in a local network to a single IP address?

Options:

A.

HTTP

B.

MAC

C.

NAT

D.

TCP

Question 55

Which addressing scheme is used to define a fixed, routable IPv4 address that is locally assigned?

Options:

A.

static

B.

DHCP

C.

link-local

D.

DHCP reservation

Question 56

The best practice for tagging AV equipment for inventory management is to

Options:

A.

only tag Items over $99.00 in value.

B.

use a unique identifier for each item.

C.

include the value of each item on the tag.

D.

label all Items of the same model with a common identifier.

Question 57

Based on this image, what is the aspect ratio for WUXGA?

Options:

A.

1.6:1

B.

1.78:1

C.

1.85:1

D.

2.35:1

Page: 1 / 14
Total 193 questions