Spring Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Free and Premium ASQ CSSBB Dumps Questions Answers

Page: 1 / 21
Total 285 questions

Certified Six Sigma Black Belt Questions and Answers

Question 1

When a Black Belt is running a designed experiment, which of the following details can be determined only after data collection?

Options:

A.

Estimate of variance

B.

Resolution

C.

Factors

D.

Blocks

Buy Now
Question 2

Which of the following roles is responsible for reviewing and approving any changes to a Six Sigma project charter?

Options:

A.

Team members

B.

Facilitator

C.

Sponsor

D.

Team leader

Question 3

Which design for X involves the team recognizing that limitations may exist with respect to creation of a product?

Options:

A.

Design for cost

B.

Design for manufacturing

C.

Design for maintainability

D.

Design for robustness

Question 4

Based on the control chart pattern shown, what conclusion should be drawn?

Options:

A.

The mean is shifting upward.

B.

The process is out of control due to a single point beyond limits.

C.

The variance is increasing.

D.

The process average is centered and stable.

Question 5

The ultimate goal of benchmarking is to

Options:

A.

acquire information to develop corporate strategies

B.

determine the industry performance level

C.

achieve best-in-class performance

D.

identify industry leaders and competitors

Question 6

During the Improve Phase, a team can use which of the following tools to test a solution off-line and predict how it will perform on-line?

Options:

A.

Simulation

B.

Short production run

C.

Statistical process control

D.

Kaizen

Question 7

A team should use a prioritization matrix in order to respond effectively to which of the following situations?

Options:

A.

All process variables are equally important

B.

Only a few variables impact the process

C.

Driving and restraining forces need to be understood

D.

Multiple variables might have an impact on process output

Question 8

A Six Sigma Black Belt is using the RACI matrix and needs to make a major decision for the current project. Which of the following stakeholder groups is not necessary?

Options:

A.

Responsible

B.

Accountable

C.

Consulted

D.

Informed

Question 9

Which of the following is the best tool to use to identify the specific tasks needed to complete a project?

Options:

A.

PERT

B.

Activity network diagram

C.

Work breakdown structure

D.

Critical path method

Question 10

Which of the following performance measures in a balanced scorecard would have KPIs that are considered predictors for the metrics related to employee satisfaction, absentee rate, and employee turnover rate?

Options:

A.

Financial perspective

B.

Customer perspective

C.

Internal business processes perspective

D.

Learning and growth perspective

Question 11

Which of the following distributions contains more observations below the average than above the average?

Options:

A.

Gaussian

B.

Exponential

C.

Binomial

D.

Hypergeometric

Question 12

Which of the following actions is part of pre-experimental planning?

Options:

A.

Determining critical values

B.

Selecting the intended response variable

C.

Increasing the number of experiments and reducing the sample size in each

D.

Ensuring that only one person conducts each experiment

Question 13

The following data were gathered for analysis:

R̄ = 1.59

X̄̄ = 10.66

Number of subgroups = 20

n = 5

On the basis of this information, what is the value of the upper control limit for the X̄ chart?

Options:

A.

9.74

B.

10.95

C.

11.58

D.

11.82

Question 14

Which of the following tools is designed to reduce cycle time?

Options:

A.

Single-minute exchange of dies (SMED)

B.

Double sampling

C.

Work in process (WIP) holding areas

D.

Statistical process control (SPC)

Question 15

Which of the following groups of people should be included in the communication plan for a Six Sigma project that is just being started?

Options:

A.

Black Belts and Green Belts only

B.

Finance department staff and Black Belts only

C.

Senior management and the Master Black Belt only

D.

All stakeholders

Question 16

Who is responsible for sustaining a Six Sigma project's benefits once the project is completed?

Options:

A.

Top management

B.

The Black Belt

C.

The project champion

D.

The process owner

Question 17

The primary benefit of using a project charter is that it

Options:

A.

ensures that the team members understand the causes of issues

B.

provides the project management tools to be used by the team

C.

ensures that stakeholders will support the project

D.

ensures the team will work to meet expectations

Question 18

Which of the following tools should be used to gain a clear picture of a business process when trying to find opportunities for improvement?

Options:

A.

Flowchart

B.

Theory of constraints

C.

Pareto chart

D.

SWOT analysis

Question 19

The engineering specification for a new circular part is 25 mm ± 1 mm. The distribution of part measurements is assumed to be normal, with 99.73% of the parts meeting the specification. For a sample size of 36, what process control limits should be used for the sample means?

Options:

A.

25 ± 0.028

B.

25 ± 0.167

C.

36 ± 0.028

D.

36 ± 0.167

Question 20

A SWOT analysis should be performed when a company is

Options:

A.

developing the objectives for a strategic plan

B.

starting the strategic planning process

C.

identifying appropriate tactics for implementing the strategic plan

D.

deploying the strategic plan throughout the organization

Question 21

A company is reviewing four processes for improvement, and each process has a unique characteristic.

Process A impacts other schedules or requirements.

Process B improvements will not disrupt delivery.

Process C is related to the organization’s strategic plan.

Process D is used in various areas of the organization.

Which of these processes should take priority over the others?

Options:

A.

Process A

B.

Process B

C.

Process C

D.

Process D

Question 22

Typically, the role of a green belt is to

Options:

A.

perform advanced statistical analysis on specific projects

B.

communicate with management regarding the progress of a project

C.

coach new members of the project on the process of change

D.

participate in projects specific to their areas of expertise

Question 23

As DMAIC projects are rolled out to process owners and staff, training needs to focus on

Options:

A.

obtaining top management support

B.

giving instruction on how to plan, administer, and control the work to top management

C.

motivating the staff to higher productivity and quality

D.

providing process owners and staff instructions on planning, doing, and controlling the process

Question 24

What tool is used to identify relationships that exist between groups of data?

Options:

A.

Tree diagram

B.

Interrelationship digraph

C.

Matrix diagram

D.

Prioritization matrix

Question 25

Which of the following team success factors will help to ensure teams know they can collect data, drill down, and think differently to reach a common goal?

Options:

A.

Team-building training

B.

Management support

C.

Sponsorship

D.

Team ground rules

Question 26

In order for a Six Sigma project team to evaluate progress on its goals and objectives, which of the following conditions must be met?

Options:

A.

The team should develop the evaluation criteria during the Measure phase of the project.

B.

The team should agree on the evaluation criteria as part of the start of the project.

C.

The team members should submit narrative evaluations regarding their individual performance at prescribed intervals throughout the project.

D.

The facilitator should establish the team’s goals and objectives at the first meeting.

Question 27

When an organization is identifying a Six Sigma project, a Black Belt should work with area management to determine the

Options:

A.

rolled throughput yield

B.

process capability as Cpk

C.

needs of the business

D.

measurement system requirements

Question 28

Which of the following control charts should a manufacturer use to measure the number of products rejected due to nonconformance?

Options:

A.

X-s chart

B.

c chart

C.

p chart

D.

ImR chart

Question 29

In a failure mode and effects analysis (FMEA), the focus should be on

Options:

A.

classifying as failures those items with risk priority numbers greater than 100

B.

creating flowcharts for the items with high risk priority number or occurrence values

C.

implementing corrective action on items that have high alpha risk values

D.

implementing corrective action on items that have high risk priority number or severity values

Question 30

A team is concerned that the read-write time on their hard drives will be affected by a mandated repair. The team collects data on hard drives before and after they are repaired. To determine the performance differences on each drive, which of the following tests should be used?

Options:

A.

ANOVA

B.

Paired t test

C.

t test

D.

F test

Question 31

In a Lean Six Sigma environment, the concept of lessons learned is used to

Options:

A.

implement improved statistical process control

B.

capture knowledge to use in other areas

C.

identify change-resistant employees

D.

identify successful teams for reward and recognition

Question 32

To improve the rolled throughput yield (RTY) on a production process, an improvement team should take which of the following actions?

Options:

A.

Reduce inventory

B.

Reduce defects

C.

Develop productivity metrics

D.

Use 5S

Question 33

Using the provided data, what is the calculated value?

Options:

A.

4.92

B.

5.37

C.

6.14

D.

6.89

Question 34

Which of the following tools should be used to identify the source of a performance gap?

Options:

A.

Matrix diagram

B.

Cause and effect diagram

C.

Activity network diagram

D.

Affinity diagram

Question 35

Which of the following documents is intended to keep an improved process in place, prevent process tampering, and transfer ownership to the people who will use the new process?

Options:

A.

A control plan

B.

A control chart

C.

A process change order

D.

A failure mode and effects analysis

Question 36

An affinity diagram should be used to solve a problem that

Options:

A.

is found as an outlier on a control chart

B.

can be easily solved by an individual

C.

requires an immediate solution

D.

needs breakthrough thinking

Question 37

Which of the following terms is defined as the ratio of value-added time to total lead time?

Options:

A.

Process cycle efficiency

B.

Cycle-time reduction

C.

Return on assets

D.

Return on investments

Question 38

A healthcare company is preparing to implement a new electronic medical records database system. The IT team has warned management about possible problems that could occur during and immediately after implementation, such as missing patient accounts, missing lab values, and incorrect medication order sets. Which of the following tools should management use to mitigate these risks?

Options:

A.

Failure mode and effects analysis

B.

Waste analysis

C.

Root cause analysis

D.

Pareto analysis

Question 39

If xₘ equals the measured value and x equals the true value, which of the following equations should be used to calculate measurement system bias?

Options:

A.

xₘ / x

B.

xₘ − x

C.

(xₘ − x) / x

D.

|xₘ − x|

Question 40

In a cost of quality system, which of the following activities should be classified as an appraisal cost?

Options:

A.

Quality planning

B.

New product review

C.

Process control measurements

D.

Design evaluation testing

Question 41

In the Theory of Constraints, the performance of a series of interconnected processes is driven by the performance of the

Options:

A.

weakest performing discrete process

B.

strongest performing discrete process

C.

operations staff

D.

scrap or rework rates required by the process

Question 42

In experimental design, a residual is defined as the difference between

Options:

A.

the df total and df treatment

B.

the SS total and SS treatment

C.

one experimental observation and another experimental observation

D.

the observed experimental value and the expected experimental value

Question 43

Which of the following methods is used to identify values that can cause invalid inferences?

Options:

A.

Residual analysis

B.

Variables sampling

C.

Plackett-Burman design

D.

Cause and effect analysis

Question 44

Which of the following benefits can be realized directly from a complete, well-defined process map?

Options:

A.

Quantitative analysis of the process input and output variables

B.

Development of an attributes control chart

C.

Development of a variables control chart

D.

Insight into the process that is not otherwise apparent

Question 45

The following table shows the sales rates and respective salaries for members of a team.

Which of the following descriptions accurately represents the correlation between sales rate and salary for the entire team?

Options:

A.

Negative

B.

No correlation

C.

Positive

D.

Undetermined

Question 46

Which of the following is included in the business case section of a project charter?

Options:

A.

Scope of the project

B.

Details about the strategic reason for the project

C.

Problem statement

D.

Details about resource availability and allocation

Question 47

The process of requisitioning, ordering, and obtaining purchased material has been causing conflicts among three different departments. Representatives of each department have formed a cross-functional team to do process mapping to define all the elements of the process and to redesign the process as appropriate. Which of the following tasks should the team perform first?

Options:

A.

Map the process at the macro level

B.

Identify root causes and confirm them with data

C.

Create a physical workflow diagram

D.

Develop a plan for implementing revisions

Question 48

This question refers to the following situation. A company has two facilities that ship the same product. The following table shows the number of defectives and the total volume for the facilities, per month. There is one opportunity per unit.

In terms of the PPM values for January and February, which facility performed better in each of those months?

Options:

A.

January: Facility X February: Facility X

B.

January: Facility X February: Facility Y

C.

January: Facility Y February: Facility Y

D.

January: Facility Y February: Facility X

Question 49

A speaker should use which of the following listening techniques when making a presentation to a group?

Options:

A.

Asking the audience to hold questions until the end of the presentation

B.

Repeating the essence of what an audience member asks

C.

Mentally preparing a response to an audience member’s key points

D.

Referring the audience members to handouts during the presentation

Question 50

The primary purpose of a statistical process control chart is to

Options:

A.

reduce variation around a target mean

B.

monitor a process and gain knowledge about its performance

C.

detect and correct out-of-specification product

D.

focus attention on process characteristics

Question 51

Based on the normal distribution shown, approximately what percentage of the data fall within one standard deviation of the mean?

Options:

A.

34%

B.

67%

C.

95%

D.

99.7%

Question 52

Which of the following perspectives of a balanced scorecard provides information on well-being of an organization, including bottom line to shareholders?

Options:

A.

Customer perspective

B.

Internal business perspective

C.

Financial perspective

D.

Learning and growth perspective

Question 53

Which of the following equations is used to calculate process capability for attribute data?

Options:

A.

DPMO = DPO × 1,000,000

B.

Cp = (USL − LSL) / 6σ

C.

Pp = (USL − LSL) / 6σlt

D.

r = Sxy / √(SxSy)

Question 54

The Six Sigma problem-solving approach is appropriate for a project that

Options:

A.

focuses on the identification of wastes

B.

requires results in a week or less

C.

requires advanced statistical thinking

D.

has informal teams that manage the process

Question 55

Which of the following terms describes risk associated with raw material pricing within a monthly budget cycle?

Options:

A.

Volatility

B.

Uncertainty

C.

Complexity

D.

Ambiguity

Question 56

When team members are satisfied with the team’s progress and have close attachments to one another, the team is typically at what stage of development?

Options:

A.

Forming

B.

Storming

C.

Norming

D.

Performing

Question 57

A Black Belt who is evaluating the relationships among three input variables should use which of the following tools?

Options:

A.

Quality function deployment

B.

Control chart

C.

Multiple linear regression

D.

Goodness-of-fit test

Question 58

Which of the following is the primary benefit of single-minute exchange of dies (SMED)?

Options:

A.

Increased flexibility

B.

Higher rolled throughput yield

C.

Fewer defects

D.

Fewer breakdowns

Question 59

Using the data provided in the chart, what is the total annual cost?

Options:

A.

5,200

B.

6,200

C.

7,200

D.

8,200

Question 60

A stable, normally distributed process has a mean of 503 and a standard deviation of 4. If the specification is 500 ± 10, with a target of 500, what is the Cpm value?

Options:

A.

0.13

B.

0.58

C.

0.67

D.

0.83

Question 61

In ANOVA, the term “treatment” is also known as

Options:

A.

response

B.

factor

C.

replication

D.

residual

Question 62

Gauge traceability requires an unbroken chain of calibrations from each gauge to

Options:

A.

a single set of standards used throughout the entire organization

B.

a certified standard that has a valid relationship to national or international standards

C.

an internal company standard that is correlated with appropriate ISO standards

D.

an internal company standard that is correlated with the standard recommended by the gauge manufacturer

Question 63

Which of the following is an acceptable way to reduce the number of options in a solution selection matrix?

Options:

A.

Brainstorming

B.

Affinity diagramming

C.

Multivoting

D.

Process mapping

Question 64

The distribution of sample means will approach a normal distribution whenever the

Options:

A.

population distribution is expected to be normal

B.

population mean is centered between the specification limits

C.

sample size is sufficiently large

D.

sample mean is centered between the control limits

Question 65

Which of the following symbols is used to denote a sample standard deviation?

Options:

A.

ρ

B.

μ

C.

σ

D.

s

Question 66

Which of the following is a factor in a designed experiment for the process of baking a pie?

Options:

A.

Flavor of the pie

B.

Texture of the pie

C.

Color of the crust

D.

Cooking time

Question 67

In hypothesis testing, the critical region is represented by

Options:

A.

β

B.

α

C.

1 − β

D.

1 − λ

Question 68

Which of the following tools could be used during the optimize phase of a DMADOV project?

Options:

A.

Design of experiments

B.

Quality function deployment (QFD)

C.

Critical-to-quality (CTQ) tree

D.

Failure mode and effects analysis (FMEA)

Question 69

The top management of an organization resists change and does not want to spend resources on continuous improvement. Which of the following methods should be used first to convince top management that continuous improvement can be effective in the organization?

Options:

A.

Present top management with case studies from other companies that have had success with continuous improvement programs

B.

Hire a consultant with a background in Lean Six Sigma to show top management how impactful such a program can be

C.

Agree to conduct a series of Kaizen blitz events in impactful areas and present results back to top management in 30 days

D.

Establish a Kaizen program plan for the organization and discuss the benefits of pursuing it with top management

Question 70

When developing a control chart, a team should monitor only those characteristics that

Options:

A.

contribute to common cause variation

B.

contribute to the overall quality of a product

C.

have a history of unreliability

D.

have measures using variables or attributes data

Question 71

Which of the following activities occurs during the Measure phase of a DMADV project?

Options:

A.

Evaluating the results of critical to quality (CTQ) factors from the pilot

B.

Specifying parameters for critical to quality (CTQ) requirements

C.

Linking the requirements to the design features

D.

Determining the capability of the new process

Question 72

In a project status meeting, a senior engineer suggests a change to a customer service process. Even though several team members know the change will alienate one of their major clients, members rush to identify potential benefits of this new change. This response is known as which of the following?

Options:

A.

Consensus

B.

Empowerment

C.

Customer-focus

D.

Groupthink

Question 73

In SPC, on an X̄ and R chart it is desirable that the X̄ chart detects process shift, and the R chart captures

Options:

A.

assignable cause variation

B.

the sample size

C.

trends

D.

common cause variation

Question 74

Which of the following tools is best to use for team conflict management?

Options:

A.

Ground rules

B.

Activity network diagrams

C.

Cause and effect diagrams

D.

Clearly written job descriptions

Question 75

The primary component for the success of a Lean Six Sigma effort is based on the

Options:

A.

commitment of the process owners who will be most affected by the project

B.

engagement and support of the organization’s executive leaders

C.

effectiveness of Black Belts and Green Belts who are leading the project

D.

criticality of the value streams that have been identified for the project

Question 76

Which of the following training delivery methods focuses on a critical incident and how to respond to a specific event, situation, or condition?

Options:

A.

Workbooks

B.

Inbox exercise

C.

Coaching

D.

Case study

Question 77

When a team is performing an analysis of variance (ANOVA), which of the following conditions would indicate the need to transform the data?

Options:

A.

There is evidence of outliers in the raw data.

B.

The residuals indicate a non-constant variance.

C.

The residuals show patterns of completely random behavior.

D.

A normal probability plot of residuals exhibits a completely linear relationship.

Question 78

Which of the following statements is the purpose of a well-written problem statement?

Options:

A.

It defines the boundaries of the project

B.

It identifies the pain point experienced by the organization

C.

It identifies functional areas impacted

D.

It identifies SMART goals and objectives

Question 79

When input variables are held constant and variation occurs in the response variable, the condition is referred to as

Options:

A.

a Type I error

B.

a discrete variable

C.

an experimental error

D.

randomization

Question 80

Which of the following is one of the perspectives of a balanced scorecard?

Options:

A.

Critical to quality

B.

Company ranking versus competitor ranking

C.

Customer satisfaction

D.

Strategic planning

Question 81

A test for independence of the variables shown in the table below (alternative vs. result) produced a test statistic with a value of χ² = 17.0.

At a significance level of α = 0.05, which of the following conclusions can be made?

Options:

A.

χ²crit = 11.07; do not reject H₀, conclude the variables are independent

B.

χ²crit = 11.07; reject H₀, conclude the variables are dependent

C.

χ²crit = 9.49; do not reject H₀, conclude the variables are independent

D.

χ²crit = 9.49; reject H₀, conclude the variables are dependent

Question 82

A hospital is preparing for a survey for a certification process by an accreditation body. Administration has provided hospital managers with a list of items that the assessors will be asking about. Which of the following analysis tools should management use as part of their preparation for this assessment?

Options:

A.

Failure mode and effects analysis (FMEA)

B.

Root cause analysis (RCA)

C.

Gap analysis

D.

Measurement system analysis (MSA)

Question 83

Which of the following tools identifies stakeholders when undertaking a process change?

Options:

A.

Readiness assessment

B.

Value stream map

C.

SIPOC diagram

D.

Process map

Question 84

The primary purpose of a pilot test is to

Options:

A.

design a new or improved process

B.

understand an existing process

C.

evaluate a proposed solution

D.

link customer expectations to quality goals

Question 85

During the design stage of a product or service, functional requirements are developed in order to

Options:

A.

establish performance levels

B.

facilitate communication between design and production or delivery

C.

improve development cost estimates

D.

minimize the amount of design rework

Page: 1 / 21
Total 285 questions