Black Friday Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Nokia 4A0-265 Exam With Confidence Using Practice Dumps

Exam Code:
4A0-265
Exam Name:
Nokia Optical Diagnostics and Troubleshooting Exam
Certification:
Vendor:
Questions:
40
Last Updated:
Nov 23, 2024
Exam Status:
Stable
Nokia 4A0-265

4A0-265: Nokia Certification Exam 2024 Study Guide Pdf and Test Engine

Are you worried about passing the Nokia 4A0-265 (Nokia Optical Diagnostics and Troubleshooting Exam) exam? Download the most recent Nokia 4A0-265 braindumps with answers that are 100% real. After downloading the Nokia 4A0-265 exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the Nokia 4A0-265 exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the Nokia 4A0-265 exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (Nokia Optical Diagnostics and Troubleshooting Exam) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA 4A0-265 test is available at CertsTopics. Before purchasing it, you can also see the Nokia 4A0-265 practice exam demo.

Nokia Optical Diagnostics and Troubleshooting Exam Questions and Answers

Question 1

Which of the following statements best describes the output of the command: show xc 1?

Options:

A.

OCH trail name, ITU channel, administrative/operational states, protection states, and Wave Keys for both directions.

B.

A list of cross-connections, including A-end, Z-end, frequency, ID number, OCH trail name, and administrative/operational states.

C.

A list of boards that this cross-connection passes through on the local node, along with administrative/operational states, expected power levels, and measured power levels.

D.

A list of all boards on all nodes that this cross-connection passes through, along with expected power levels, measured power levels, and allowed power deviations.

Buy Now
Question 2

Consider the exhibit. A single directional fiber cut is occurring between two amplifiers in unidirectional configuration with Raman pump.

Multiple services are crossing the affected span.

Which node(s) will report an Incoming Payload LOS" alarm?

Options:

A.

No node, as a Raman pump is used in Node A.

B.

Node C only.

C.

Both Node A and Node C

D.

Neither Node A nor Node C.

Question 3

Consider the exhibit which shows an EPT Power ManagementReport for an ingress amplifier.

What is the available output optical power range?

Options:

A.

-0.6 to 1.72 dB

B.

-0.02 to 1.14 dB

C.

0.56 to 1.14 dB

D.

0.56 to 1.72 dB