Weekend Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: save70

Huawei H19-424_V1.0 Exam With Confidence Using Practice Dumps

Exam Code:
H19-424_V1.0
Exam Name:
HCSP-Presales-Campus Network Planning and Design V1.0
Certification:
Vendor:
Questions:
107
Last Updated:
Feb 23, 2025
Exam Status:
Stable
Huawei H19-424_V1.0

H19-424_V1.0: Huawei Certification Exam 2025 Study Guide Pdf and Test Engine

Are you worried about passing the Huawei H19-424_V1.0 (HCSP-Presales-Campus Network Planning and Design V1.0) exam? Download the most recent Huawei H19-424_V1.0 braindumps with answers that are 100% real. After downloading the Huawei H19-424_V1.0 exam dumps training , you can receive 99 days of free updates, making this website one of the best options to save additional money. In order to help you prepare for the Huawei H19-424_V1.0 exam questions and verified answers by IT certified experts, CertsTopics has put together a complete collection of dumps questions and answers. To help you prepare and pass the Huawei H19-424_V1.0 exam on your first attempt, we have compiled actual exam questions and their answers. 

Our (HCSP-Presales-Campus Network Planning and Design V1.0) Study Materials are designed to meet the needs of thousands of candidates globally. A free sample of the CompTIA H19-424_V1.0 test is available at CertsTopics. Before purchasing it, you can also see the Huawei H19-424_V1.0 practice exam demo.

HCSP-Presales-Campus Network Planning and Design V1.0 Questions and Answers

Question 1

Regarding planning and design tools, the following statements are wrong

Options:

A.

The planning and design tool is used for after-sales planning and cannot be used before sales

B.

When the equipment model cannot be used, you can feedback it in the tool platform

C.

The tool can ensure the logical consistency and data consistency of the design

D.

In the case of large or frequent changes in the network, the old project can be retained and the new project can be designed

Buy Now
Question 2

Which of the following does not belong to the reliability technology of the controller server ()

Options:

A.

Local hardware redundancy protection

B.

TE HSB

C.

Local software protection

D.

Remote disaster recovery

Question 3

The description of the dual-border and WAC interconnection design of the campus distributed gateway is incorrect ()

Options:

A.

In the overlay interconnection solution, it is recommended to run the VRRP VRRP virtual address between the two borders as the gateway for wireless users

B.

During wireless centralized forwarding, the WAC and the border need to manage IP communication and service VLAN communication, that is, the underlay and overlay need to be connected.

C.

During wireless local forwarding, only the management IP address needs to be communicated between the WAC and the border, that is, the underlay is connected.

D.

Supported networking: WAC dual-node hot standby (VRRP dual-node hot standby or dual-link hot standby), and dual-border port sub-networking, recommended dual-node VRRP hot standby: In multi-campus interconnection LAN-WAN convergence scenarios, refer to the following topology